✅ Approved and Released
Lazy Nine MUD 1A Treated Effluent Holding Pond
The applicant is proposing to construct approximately 1048 linear feet of a 12-inch effluent force main, a 64.5 acre-foot treated effluent holding pond, and other associated improvements.
📍 16801-1/2 W SH 71, BEE CAVE, TX, 78738📄 Site Plan🏛️ BEE CAVE ETJ
Entitled100%
Timeline
Applied: Sep 30, 2011
Updated: Jul 10, 2012
📊Site Plan Metrics
#10658633
FAR:—
Impervious:0.2%
Applied:Sep 30, 2011
Approved:Jul 10, 2012
✅
Approved and Released
Step 5 of 5: Released ✓Site plan fully approved and released. All conditions cleared. Ready for construction permitting.
Next:Pull building permits to begin construction.
📋Scope of Work
The applicant is proposing to construct approximately 1048 linear feet of a 12-inch effluent force main, a 64.5 acre-foot treated effluent holding pond, and other associated improvements.
📅Entitlement Timeline
Application Filed
+30dSeptember 30, 2011
In Review
+254dOctober 30, 2011
Approved
July 10, 2012
💰Property Tax Assessment
View on TCAD$565K
Property Value
Market, Appraised & Assessed values are equal
Land: $565K (100%)Improvements: — (0%)
📍
Property Address (TCAD)
W STATE HY 71 78738
👤
Property Owner (TCAD)
WS-COS INVESTMENTS LLC
0
Tax Year:2026
Type:VACANT LOT
🤝 Project Team
🏠 Owner Contact
J
J. Robert Long
Wheelock Street Capital
📝 Applicant Contact
S
Seth Mearig, PE
Wheelock Street Capital
📐 Nearby Site Plans
Caudill Lane Waterline Extension
Approved and Released • AUSTIN • Mar 6, 2017
KENNEDY RIDGE WASTEWATER COLLECTION SYSTEM IMPROVEMENTS
Approved and Released • Austin • Mar 2, 2007
Lazy Nine MUD Treated Effluent Hldg Pond(W/R of SP-2009-0042D)
Expired • BEE CAVE • Oct 12, 2011
LAZY NINE MUD SH 71 WATER TRANSMISSION MAIN
Approved and Released • BEE CAVE • Oct 12, 2011
Construction Plans for SH71 PEC Electrical Improvements
Approved and Released • BEE CAVE • Jan 10, 2012
Key Stakeholders
Zoning & Land Use
Current Zoning
N/A
Existing Use
Vacant
Proposed Use
force main & holding pond
Environmental & Geographic
💧 WatershedHurst Creek
Watershed ClassWatersupply Rural
Impervious Cover0.2%
Traffic Impact Analysis
TIA Not Required
Case Manager
👤
Michelle Casillas
City of Austin Development Services
📌 Case Details
Case Number10658633
Case TypeSite Plan
Sub TypeSite Plan Administrative
Permit NumberSP-2011-0282D
JurisdictionBEE CAVE ETJ
TCAD ID0123860301
Property RSN3541123
Legal Description
LOT 5 BLK B SWEETWATER CROSSING PHS 1