The applicant is proposing to re-grade a channel in response to a red tag for fill placed without a permit.
Site plan fully approved and released. All conditions cleared. Ready for construction permitting.
The applicant is proposing to re-grade a channel in response to a red tag for fill placed without a permit.
ABS 24 DELVALLE S ACR 5.6500