Pascal Lane Dock Renovation
The applicant is proposing a demolition of a 2 story wood frame 3-slip dock on steel piers; keep existing piers as shown on plans and build new galvanized steel frame 3-slip dock and swimming plat form with composite deck, metal railings and 60% open screen area on upper level of a 2 story dock with associated improvements.
📊Site Plan Metrics
#11696808Expired
Site plan approval has expired. Resubmission may be required.
📋Scope of Work
The applicant is proposing a demolition of a 2 story wood frame 3-slip dock on steel piers; keep existing piers as shown on plans and build new galvanized steel frame 3-slip dock and swimming plat form with composite deck, metal railings and 60% open screen area on upper level of a 2 story dock with associated improvements.
📅Entitlement Timeline
🤝 Project Team
Property Owner
Applicant / Developer
📐 Nearby Site Plans
Zoning & Land Use
Environmental & Geographic
Case Manager
Explore Area
📌 Case Details
Legal Description
LOT 6-A DAVENPORT WEST TRT C-3 SEC 2 THE POINT AT ROB ROY AMENDED PLAT OF LOTS 6&7