CLASS-ITEM
DESCRIPTION
906-08
Automation; Controls; Instrumentation, Architectural Services
906-30
Fire Protection, Architectural Services
906-44
Heating; Ventilating, Air Conditioning โ Architectural Services
906-78
Security Systems โ Architectural
906-92
Utilities, Gas, Steam, Electric, Architectural Services
925-07
Air Conditioning, Heating and Ventilating Engineering
925-22
Control Systems Engineering
925-95
Utilities, Gas, Steam, Electric Engineering
961-14
Commissioning of Facilities Service, Functional and Pre-functional
992-15
Air Quality Monitoring Equipment Testing and Calibration Services
992-39
Electrical Systems Testing Services
992-47
HVAC System Testing, Balancing and Troubleshooting Services
992-55
Miscellaneous Testing and Calibration Services
SCOPE: In accordance with the provisions of TexasGovernment Code, Chapter 2254, Subchapter A, Professional Services, and rulesand procedures adopted by the Texas Facilities Commission (TFC), TFC isrequesting submittal of qualifications to provide professional whole buildingcommissioning services for Project #24-047-4006, the TSLAC Archives and RecordsCenter in Pflugerville, Texas, to support the successful execution andcompletion of programming, design, construction and project closeout.
CONTRACTTERM: It isthe intention of TFC to award a Contract for professional buildingcommissioning services for the term of the project. Services undertakenpursuant to this RFQ will be required to commence within ten (10) calendar daysof delivery of a notice to proceed. The preliminary/targeted pre-constructionperiod is in progress and estimated to be complete by April 2026 and theConstruction period is estimated to begin October 2025. The total contract termis projected for seven hundred forty-two (742) calendar days.
STATEMENTOF WORK:
1.TheCxA services includes, but is not limited to, review of design documents,provision of commissioning specification to Engineer of Record (EOR),coordination and witnessing of equipment testing, witness, verification anddocumentation of correctly operating equipment, controls system and life safetysystems, review of TAB report, coordination with TFC and the Design-Build Teamto address issues identified during all phases.
2.The CxA will work closely with TFC/PMF and collaborate with the Design-BuildTeam, and subcontractors during all phases of the Project, as described inContract. TFC shall promptly communicate with pertinent parties, includingtopics regarding information needs and responses to needs of other parties.
3.Provide enhanced commissioning services for design, construction,post-construction, and warranty phases necessary and/or reasonably inferablefrom Attachment F โ โProgram Validation Report date 12/6/24โandAttachment D, Professional Services Agreement template.
4.Develop and update commissioning plan throughout project.
5.Develop and update commissioning specifications.
6.Provide design and submittal reviews, commissioning related documents toincorporate into the construction documents, installation verification,functional performance testing, and operations and maintenance (O&M)training to ensure the project requirements.
7.Provide input on the overall master schedule where commissioning related tasksare to be performed.
8.Develop procedures for an issues log to track all commissioning related issues,deficiencies, and resolutions.
9.Provide a final commissioning report.
10.Summary of Systems Commissioned:
AttachmentF โProgram Validation Report date 12/6/24โ. Agent shall commission allelectrical, mechanical, and building envelope systems for the entire project toinclude but not limited to the following:
A.Wet, Dry and Chemical pipe sprinkler systems
B.Fire & smoke detection system and integration with other systems
C.Alarm systems
D.Plumbing systems
E.HVAC & ventilation systems
F.Package chillers
G.Building envelope/enclosure systems
H.All electrical systems
I.All low voltage systems (fire alarm, data, safety & security)
MANDATORYPRE-SUBMITTAL TELECONFERENCES: The mandatory pre-submittal conferences willbe held on Tuesday, April 22, 2025 at 10:00 AM and Wednesday, April 23, 2025 at10:00 AM. Pre-registration is requiredto participate in the teleconference. Respondents must have an employee oftheir firm attend at least one (1) of the two (2) scheduled pre-submittalteleconferences. TFC shall reject submittals submitted by firms that didnot attend one of the mandatory pre-submittal conferences.
TFC is using the eProcurement system Bonfire. Respondents must register for a Bonfireaccount (No Charge) to submit a response. Respondents must submit their responses/submittals at the followinglink: https://tfcstate.bonfirehub.com/opportunities/180534
SCHEDULE OFEVENTS: TFC reserves theright to change the dates shown below.
EVENT
DATE
Issue RFQ
4/7/2025
Mandatory Pre-Submittal Conference
4/22/2025
Tuesday, 10:00 AM
(OR)
Mandatory Pre-Submittal Conference
4/23/2025
Wednesday. 10:00 AM
Deadline for Submission of Questions
4/29/2025
Deadline for Submission of Qualifications & HSP
5/06/2025
Tuesday @ 3:00 PM
Notification to Interview
5/16/2025
If Interviews are NOT required by TFC
Award by Commission
6/19/2025
Execute Contract
7/15/2025
If Interviews are required by TFC
Interviews of short-listed firms
5/27/2025
Award by Commission
6/19/2025
Execute Contract
7/15/2025
ThisRequest for Qualifications (RFQ) is posted on the Electronic State BusinessDaily (ESBD) located on the Texas Comptroller of Public Accountsโ web pagelocated at
https://www.txsmartbuy.com/esbddetails/view/0004692
Thiswebsite will have the most current information during the solicitation.
ESBD_407879_1744040864626_0004692 Attachment C - HUB Compliance Reporting System - Online Process Guide.pdf
Attachment C - HUB Compliance Reporting System - Online Training Guide
ESBD_407879_1744040919604_0004692 Attachment D - Contract Template FINAL.pdf
Attachment D - Contract Template
0004692 Attachment F - Program Validation Report.pdf
ESBD_407879_1744055766349_RFQ #0004692 Commissioning for TSLAC Archives and Records Center FINAL.pdf
RFQ Solicitation Document
ESBD_407879_1745424834697_0004692 Addendum #1 Final.pdf
Addendum #1 to RFQ #0004692
Documents available on the original posting.
CMR for DSHS Public Health Laboratory
CMR for Permian Basin Beacon Park
CMR for Permian Basin Infrastructure Project
IFB for Replacement Cedar Fence โ TSBVI Superintendentโs Residence
IFB for Replacement Dust Collection System โ TSD Woodshop
This agency has awarded 8 contracts
RFP for Doors, Coiling Grilles, Turnstiles, Vehicle Barriers, and Dock Levelers
IDIQ Professional Engineering Services, HVAC & TAB and Related Professional Services
IDIQ Professional Civil Engineering & Land Surveying Services
AE Services for J. E. Rudder Building Utilization and Modernization
IDIQ Professional Engineering Services for Geotechnical, Construction Materials Testing, and Related Professional Services
BUILDING SYSTEMS AND ENVELOPE COMMISSIONING SERVICES FOR TEXAS SCHOOL FOR THE DEAF
Job Order Contracting General Contractor Services
RFP for Building Automation Systems Maintenance and Repair Services
Texas Facilities Commission
๐๏ธ State Agency
Agency #303
View all Texas Facilities Commission bids โView the official posting on TX SmartBuy
View on TX SmartBuy