NOTICETO OFFERORS
1110206a(Re-Bid) Headquarters Repairs, Utility System Installation and RestroomReplacement at Seminole Canyon State Park & Historic Site
Proposals forthe above project will only be accepted from Contractors when submitted to theTexas Parks and Wildlife Department using the online Bid Portal hosted byTrimble. Proposals will be accepted by the Contracting Branch, InfrastructureDivision until 2:00 PM CST, July 2, 2025.
Pre-ProposalConference
The Texas Parksand Wildlife Department will host a virtual pre-proposal conference at 10:30 AMCST, Wednesday, June 11, 2025
Although thepre-proposal conference is not mandatory, Offerors are strongly encouraged toattend as important information regarding proposal submittal requirements andan overview of the Project will be discussed. Failure to give properconsideration to conditions when preparing the proposal will not constitutegrounds for additional compensation.
Conference willbe conducted using Microsoftยฎ Teams. Registration is required to attendthe pre-proposal conference using the link provided in RFP. Followingregistration, you will receive a confirmation email with a link to join theevent.
Following theconference, the PowerPointโข presentation will be posted in the bid portal.
Site visit is scheduledat 10:30am CST, Thursday, June 12, 2025. Check in with the Front desk andlet them know you are there to see this project sites.
Seminole CanyonState Park & Historic site is located forty (40) miles west of Del Rio,Texas on U.S. Highway 90, just east of the Pecos River Bridge. Thephysical address is 434 Park Road 67, Comstock, Texas 78837.
All questionsrelated to this project should be directed to Mindi Johnson, Contract Manager,through the Trimble Bid Portal Q&A board no later than June 17, 2025. TheQ&A board can be accessed using the above Trimble Bid Portal link.
General Scopeof Work:
Project scopeincludes all labor, equipment, tools, materials, and incidentals necessary, butnot limited to the following:
Renovation ofthe Headquarters/Visitor Center Building and Site Improvements.
Installation ofwater and electrical to fourteen (14) camping sites.
New Restroom.
demolition andreplacement of Restroom.
ConstructionCost Estimate: $3,947,400.00 to $4,155,150.00
ProjectSchedule:
Contract timeis of the essence and all Work shall be substantially completed within theperformance period of nine hundred thirteen (913) calendar days from writteneffective date of Notice to Proceed. The project will be completed in two(2) Construction Phases: (Phase 1 includes work all associated with theRoadrunner Flatโs, New Restroom and Camp Loop Utilities; Phase 2 includes allwork associated with Headquarters / Visitor Center building and siteimprovements , to demolition and replacement of the Desert Vista camping arearestroom, โ Furnish Temporary Trailer for Park Headquarters building) Phase Iwill need to be completed prior to starting work on Phase 2.
Offeror mustprovide a bid security as set forth by the Uniform General Conditions, Article5.1.2. The bid security shall be in the form of a bond accompanied byvalid power of attorney, drawn to Texas Parks and Wildlife Department for notless than five percent (5%) of the total amount of the proposal, including thetotal of all separate priced items and multiple base pricing items and/oralternate price items and/or optional pricing and/or allowances. Toensure adequate bid security, offerors should calculate bid security based onthe highest possible monetary award. Offeror shall upload a .pdf file of thebid security documents to the bid portal. No other forms of bid securitywill be accepted. Proposals will be rejected if the appropriate bidsecurity is not furnished in the form specified above and by the time set forreceipt of proposals.
SupplementalBidding Information
A virtualpublic proposal opening of responses will be conducted by the Texas Parks andWildlife Department via Microsoft Teams at 3:00 PM CST, July 2, 2025. Interestedattendees must register in advance for this meeting. Link can be found inRFP Documents to register for the bid opening. After registering, participantswill receive a confirmation email containing information about joining themeeting.
Aviation Equipment Maintenance and Repair Services
Americans with Disability Act (ADA) Cloud-hosted Software System
IN- 1910322- Dryout Services- Lake Texoma LE Center
Replace Two Residential Septic Systems
Installation of Irrigation Water Line at Lockhart State Park
This agency has awarded 8 contracts totaling $608K
IN- 1910322- Dryout Services- Lake Texoma LE Center
โ MBI Services, Inc. dba True North of McKinney & Frisco
Live Oak County Boat Storage Space Lease
Industrial Air Blower
Refuse and Trash Collection, Removal and Disposal Services at TPWD Headquarters Complex and TPWD Airport Commerce
1000-Hour Routine Maintenance Service for MAN Marine Diesel Engines
Zapata County Boat Storage Space Lease
Temporary Stabilization of two structures, Penn Farm at Cedar Hill State Park
โ Captain Construction Company
Fire Shelter, Forest Fire Regular with Blue Case and Silver Tent
โ Bullchase, Inc.
Texas Parks and Wildlife Department
๐๏ธ State Agency
Agency #802
View agency profile โView all Texas Parks and Wildlife Department bids โView the official posting on TX SmartBuy
View on TX SmartBuy