Project 25-102-LFL HVAC Unit Replacements at Lufkin SSLC
RFP HHS0016973
Link to Posting on ESBD
The Health and Human Services Commission (โOwnerโ), for and on behalf of its Health and Specialty Care System Division (โHSCSโ), is soliciting Competitive Sealed Proposals (โProposalsโ) for selection of a General Contractor (โContractorโ) to provide general construction and construction administration services to the Owner for Project No. Project 25-102-LFL, HVAC Unit Replacements at Lufkin SSLC (the โProjectโ), in accordance with the terms, conditions, and requirements set forth in this Solicitation.
This Solicitation is being issued to select a Contractor for the Project as provided by Texas Government Code, Section 2155.144(b-2) and Chapter 2269, Subchapter D.
Project Location, Summary, and Budget
Project Location:
Lufkin State Supported Living Center
6844 US Highway 69 North
Pollock, TX 75969
Project Summary: The scope of work includes, but is not limited to, the following:
Replacing the existing HVAC units in Buildings 506, 523, and 524 with new units. The existing HVAC units will need to remain operational until they are ready for the changeover. This work will need to be phased and coordinated with the facility as these buildings will be occupied during the construction period.
For complete Project information, refer to Attachments H-1, Project Drawings, and H-2, Project Manual, to the Exhibit C, Draft General Construction Services Contract.
Project Estimate: The approximate cost for construction of the Project is $750,000.00
Optional Pre-Proposal Webinar and Mandatory Jobsite Visits
HHSC will conduct one (1) optional pre-proposal webinar that will be held on the date and time described below. Attendance at the pre-proposal webinar is optional, and attendance at one (1) site visit is mandatory.
Optional Pre-Proposal Webinar and HSP Training: Monday, March 2, 2026 at 10:00 a.m. Central Time
Mandatory Jobsite Walkthroughs: All Respondents are required to attend one Facility Site Visit as specified in Section 2.2 (Schedule of Events). Potential Respondents should be prepared to complete one of the scheduled tours; additional tours will not be offered.
Jobsite Walkthrough Location:
Lufkin State Supported Living Center
6844 US Highway 69 North
Pollock, TX 75969
See Exhibit H for Site Map
Jobsite Walkthrough Schedule
March 3, 2026 at 1:00 p.m. Central Time
OR
March 4, 2026 at 10:00 a.m. Central Time
Link to Posting on ESBD
ESBD_492613_1772045707908_HHS0016973 Exhibits.zip
HHS0016973 Exhibits
ESBD_493108_1772045707908_HHS0016973 Attachments.zip
HHS0016973 Attachments
ESBD_492613_1772058280803_HHS0016973 RFP.pdf
HHS0016973 RFP Doc
Documents available on the original posting.
Articulate 360 E-Learning Services
As Needed Plumbing Services, Lubbock State Supported Living Center
Window Replacement Building 536 Rusk State Hospital
Automatic Transfer Switch Installation at the Rio Grande State Center
Insulation Removal and Spray Foam Application Austin State Supported Living Center
This agency has awarded 8 contracts totaling $768K
Warehouse Stock
โ McKesson Medical-Surgical
HVac Repair 3rd and 4th qtr
โ TDInndustries Inc.
dental equipment replacement
โ Henry Schein
FY26 Road show
โ El Paso Convention Center for Michele Maria Franklin
FY26SW Red Gate SQL Toolbelt
โ SHI Government Solutions
332286 Econ chairs
โ TEXAS CORRECTIONAL INDUSTRIES
FY26 Chiller Rental Denton SSLC
โ TRANE US INC
Condenser Pump & Motor Installation in BLDG. 537 at Texas Center for Infectious Disease (TCID)
Health & Human Services Commission
๐๏ธ State Agency
Agency #529
View agency profile โView all Health & Human Services Commission bids โView the official posting on TX SmartBuy
View on TX SmartBuy