Project 25-102-LFL HVAC Unit Replacements atLufkin SSLC
RFPHHS0016973v2
The Health and Human Services Commission (โOwnerโ), forand on behalf of its Health and Specialty Care System Division (โHSCSโ),is soliciting Competitive Sealed Proposals (โProposalsโ) for selectionof a General Contractor (โContractorโ) to provide general constructionand construction administration services to the Owner for Project No.Project 25-102-LFL, HVAC Unit Replacements at Lufkin SSLC (the โProjectโ),in accordance with the terms, conditions, and requirements set forth in thisSolicitation.
This Solicitation is being issued to select a Contractor forthe Project as provided by Texas Government Code, Section 2155.144(b-2)and Chapter 2269, Subchapter D.
Project Location, Summary, and Budget
Project Location:
Lufkin State Supported Living Center
6844 US Highway 69 North
Pollock, TX 75969
Project Summary: The scope of work includes, but is notlimited to, the following:
Replacing the existing HVAC units in Buildings 506, 523, and524 with new units. The existing HVAC units will need to remain operationaluntil they are ready for the changeover. This work will need to be phased andcoordinated with the facility as these buildings will be occupied during theconstruction period.
For complete Project information, refer to Attachments H-1,Project Drawings, and H-2, Project Manual, to the Exhibit C,Draft General Construction Services Contract.
Project Estimate: The approximate cost for constructionof the Project is $750,000.00
Mandatory Pre-Proposal Webinar and Optional JobsiteVisit
HHSC will conduct two mandatory pre-proposal webinars that will be held atthe dates and times listed on the RFP Attendance at one (1) pre-proposalwebinar is mandatory. Failure to attendwill result in the disqualification of a Respondent. Proposals received fromRespondents not listed on the attendance log will not be considered. PotentialRespondents must be prepared to attend one of the scheduled webinars,additional webinars will not be offered.
Jobsite Walkthrough Location:
Lufkin State Supported Living Center
6844 US Highway 69 North
Pollock, TX 75969
Jobsite Walkthrough Schedule:
April 2, 2026 at 9:00 a.m. Central Time
Articulate 360 E-Learning Services
As Needed Plumbing Services, Lubbock State Supported Living Center
Window Replacement Building 536 Rusk State Hospital
Automatic Transfer Switch Installation at the Rio Grande State Center
Insulation Removal and Spray Foam Application Austin State Supported Living Center
This agency has awarded 8 contracts totaling $768K
Warehouse Stock
โ McKesson Medical-Surgical
HVac Repair 3rd and 4th qtr
โ TDInndustries Inc.
dental equipment replacement
โ Henry Schein
FY26 Road show
โ El Paso Convention Center for Michele Maria Franklin
FY26SW Red Gate SQL Toolbelt
โ SHI Government Solutions
332286 Econ chairs
โ TEXAS CORRECTIONAL INDUSTRIES
FY26 Chiller Rental Denton SSLC
โ TRANE US INC
Condenser Pump & Motor Installation in BLDG. 537 at Texas Center for Infectious Disease (TCID)
Health & Human Services Commission
๐๏ธ State Agency
Agency #529
View agency profile โView all Health & Human Services Commission bids โView the official posting on TX SmartBuy
View on TX SmartBuy