AA TERMINAL C UM ROOM
AA TERMINAL C UM ROOM is a renovation/alteration project at TERMINAL C DFW, Dallas, in Dallas County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Sep 2008). The project has an estimated value of $140K.
๐Project Metrics
TDLR #EABPRJA9800348Project Closed
Project has been completed and closed
AA TERMINAL C UM ROOM is a Renovation/Alteration project located at TERMINAL C DFW, Dallas, TX 75261 in Dallas, Texas. The project has an estimated value of $140K. DFW is the property owner and LEXINGTON GROUP INTL is the design firm of record. The project was registered with TDLR on September 5, 2008.
โFrequently Asked Questions
What is AA TERMINAL C UM ROOM?
AA TERMINAL C UM ROOM is a renovation/alteration project at TERMINAL C DFW in Dallas, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Unattended minor space alteration for American Airlines
Is AA TERMINAL C UM ROOM open in Dallas?
Construction on AA TERMINAL C UM ROOM is complete โ TDLR records show the project passed its required accessibility inspection in Sep 2008. The building is finished and very likely open.
Where is AA TERMINAL C UM ROOM located?
AA TERMINAL C UM ROOM is located at TERMINAL C DFW, Dallas, TX, 75261, in Dallas County.
Who is the owner or developer of AA TERMINAL C UM ROOM?
DFW is the property owner/developer of record for AA TERMINAL C UM ROOM, per its TDLR project registration.
Who is the architect or design firm for AA TERMINAL C UM ROOM?
LEXINGTON GROUP INTL is the design firm of record for AA TERMINAL C UM ROOM, according to its TDLR filing.
How much does AA TERMINAL C UM ROOM cost and how big is it?
AA TERMINAL C UM ROOM has an estimated construction value of $140K, based on its TDLR filing.
๐Scope of Work
Unattended minor space alteration for American Airlines
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Sep 5, 2008
Review Complete
Inspection Complete
Closed
Sep 1, 2008