TERMINAL D MEP PATHWAY - CHANGE ORDER 2
TERMINAL D MEP PATHWAY - CHANGE ORDER 2 is a renovation/alteration project at DFW AIRPORT, Dfw Airport, in Dallas County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jul 2016). The project has an estimated value of $50K.
๐Project Metrics
TDLR #EABPRJB6814045Project Closed
Project has been completed and closed
TERMINAL D MEP PATHWAY - CHANGE ORDER 2 is a Renovation/Alteration project located at DFW AIRPORT, Dfw Airport, TX 75261 in Dfw Airport, Texas. The project has an estimated value of $50K. DFW is the property owner and HKS INC. is the design firm of record. The project was registered with TDLR on April 11, 2016.
โFrequently Asked Questions
What is TERMINAL D MEP PATHWAY - CHANGE ORDER 2?
TERMINAL D MEP PATHWAY - CHANGE ORDER 2 is a renovation/alteration project at DFW AIRPORT in Dfw Airport, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Provide HVAC duct connections at LongChamp (D27). Relocate Janitorial Equipment at D10 to D36 and provide power
Is TERMINAL D MEP PATHWAY - CHANGE ORDER 2 open in Dfw Airport?
Construction on TERMINAL D MEP PATHWAY - CHANGE ORDER 2 is complete โ TDLR records show the project passed its required accessibility inspection in Jul 2016. The building is finished and very likely open.
Where is TERMINAL D MEP PATHWAY - CHANGE ORDER 2 located?
TERMINAL D MEP PATHWAY - CHANGE ORDER 2 is located at DFW AIRPORT, Dfw Airport, TX, 75261, in Dallas County.
Who is the owner or developer of TERMINAL D MEP PATHWAY - CHANGE ORDER 2?
DFW is the property owner/developer of record for TERMINAL D MEP PATHWAY - CHANGE ORDER 2, per its TDLR project registration.
Who is the architect or design firm for TERMINAL D MEP PATHWAY - CHANGE ORDER 2?
HKS INC. is the design firm of record for TERMINAL D MEP PATHWAY - CHANGE ORDER 2, according to its TDLR filing.
How much does TERMINAL D MEP PATHWAY - CHANGE ORDER 2 cost and how big is it?
TERMINAL D MEP PATHWAY - CHANGE ORDER 2 has an estimated construction value of $50K, based on its TDLR filing.
๐Scope of Work
Provide HVAC duct connections at LongChamp (D27). Relocate Janitorial Equipment at D10 to D36 and provide power
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Apr 11, 2016
Review Complete
Inspection Complete
Closed
Jul 1, 2016