โœ…Inspection Complete๐Ÿ—๏ธ New Construction๐Ÿ’ต This project is privately funded, on private land for private use.

MOXY AUSTIN

2552 GUADALUPE STREET, Austin, TX 78705, Austin, TX, 78705
Final Inspection85%

๐Ÿ“ŠProject Metrics

TDLR #EABPRJB9805554
$17.8M
Project Value
โ€”
Square Feet
โ€”
Cost/SqFt
1y 8mo
Duration
Registered:Nov 19, 2018
Start:Apr 1, 2019
Target:Dec 1, 2020
โœ…

Inspection Complete

Final inspection completed, awaiting project closure

๐Ÿ“‹Scope of Work

New construction of 162-dey hotel

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

๐Ÿ“…Compliance Timeline

Project Registered
November 19, 2018
Inspection Complete
December 1, 2020
Construction Start
April 1, 2019
Expected Completion
December 1, 2020

๐Ÿ“Location & Views

Open in MapsGet Directions|30.29008, -97.74139

๐Ÿ“„Related City Permits

Building permits found at or near this location

2538 GUADALUPE ST
Same location

Replacement of any self-contained packaged units

ExpiredMechanical PermitChange OutMar 2024
View Details
2024-028617 MP
๐Ÿ”งRWB Air Services
2538 GUADALUPE ST
Same location

Replace existing Federal Pacific panel with new 400amp 3phase Square D panel

FinalElectrical PermitRepairSep 2023
View Details
2023-118029 EP
๐Ÿ”งJackson Electric Inc
2538 GUADALUPE ST
Same location

Trench and install floor drain to middle bar. Trench and install floor drain to middle bar. Work will consist doing a scan of the concrete flooring where the trench will be exposed for any post tension cables water lines rebar etc. and then we will proceed with exposing a trench through the concrete floor behind the middle bar area. We will also be using a plastic set up and an air scrubber to cover all areas that may be affected by dust or equipment during the excavation and backfill process. Once it is exposed we will be installing a PVC floor drain that will tie into the existing drain behind the bar that heads to the small grease trap. Once the PVC drain is completely installed it will tested for proper functioning and for any leaks and upon passing of inspection the trench will then be back filled and the concrete flooring will be re-patched. Timeframe: Job will take roughly 3 days to finish from start of excavation. Expose old grease trap and reconnect drain lines going thru it. Trench expose and repair belly in drain line for front bar. Tunnel expose and repair belly in drain line for back kitchen area Remove and replace broken portion of drain line for front restrooms. We will be making repairs/alterations to the drain system which will include 2 trenches and 1 tunnel

FinalPlumbing PermitRepairSep 2023
View Details
2023-113253 PP
๐Ÿ”ง1st Home and Commercial Services
2522 GUADALUPE ST
119 ft away

Install an lluminated pan sign. Snag. East elevation.

FinalElectrical PermitWallAug 2024
View Details
2024-102011 EP
2522 GUADALUPE ST
119 ft away

Interior Painting minor cosmetic work

FinalBuilding PermitRemodelSep 2022
View Details
2022-143340 BP
๐Ÿ”งBetter House and Home

Get alerts for Travis

Daily email when new projects start nearby.

Start Alerts - $19/mo

Download project data

Get curated lists of projects with full contact info.

Browse Data Lists