SDMC AM ADMIT
SDMC AM ADMIT is a renovation/alteration project at 919 EAST 32ND STREET, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Nov 2008). The project has an estimated value of $300K.
๐Project Metrics
TDLR #EABPRJA9800729Project Closed
Project has been completed and closed
SDMC AM ADMIT is a Renovation/Alteration project located at 919 EAST 32ND STREET, Austin, TX 78705 in Austin, Texas. The project has an estimated value of $300K. ST. DAVID'S MEDICAL CENTER is the property owner and SCHNEIDER HALLS DESIGN is the design firm of record. The project was registered with TDLR on September 12, 2008.
โFrequently Asked Questions
What is SDMC AM ADMIT?
SDMC AM ADMIT is a renovation/alteration project at 919 EAST 32ND STREET in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Renovation of approximately 2,990 square feet of space on the second floor of the acute care hospital to accommo
Is SDMC AM ADMIT open in Austin?
Construction on SDMC AM ADMIT is complete โ TDLR records show the project passed its required accessibility inspection in Nov 2008. The building is finished and very likely open.
Where is SDMC AM ADMIT located?
SDMC AM ADMIT is located at 919 EAST 32ND STREET, Austin, TX, 78705, in Travis County.
Who is the owner or developer of SDMC AM ADMIT?
ST. DAVID'S MEDICAL CENTER is the property owner/developer of record for SDMC AM ADMIT, per its TDLR project registration.
Who is the architect or design firm for SDMC AM ADMIT?
SCHNEIDER HALLS DESIGN is the design firm of record for SDMC AM ADMIT, according to its TDLR filing.
How much does SDMC AM ADMIT cost and how big is it?
SDMC AM ADMIT has an estimated construction value of $300K, based on its TDLR filing.
๐Scope of Work
Renovation of approximately 2,990 square feet of space on the second floor of the acute care hospital to accommo
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Sep 12, 2008
Review Complete
Inspection Complete
Closed
Nov 1, 2008
๐Related Projects
๐คSame Owner
$683.7M total๐Related City Permits
Building permits found at or near this location
Interior Remodel of Existing Office Space with Access Control Requested - Phase 1 Phase 2 Phase 3 for Suite 1400 and Phase 1 for Suite 1500)
Interior Remodel of Existing Office Space with Access Control Requested - Phase 1 Phase 2 Phase 3 for Suite 1400 and Phase 1 for Suite 1500)
Interior Remodel of Existing Office Space with Access Control Requested - Phase 1 Phase 2 Phase 3 for Suite 1400 and Phase 1 for Suite 1500)
Interior Remodel of Existing Office Space with Access Control Requested - Phase 1 Phase 2 Phase 3 for Suite 1400 and Phase 1 for Suite 1500)
Interior Remodel of Existing Office Space with Access Control Requested - Phase 1 Phase 2 Phase 3 for Suite 1400 and Phase 1 for Suite 1500)