SDMC ICU 12 BED BUILD OUT
SDMC ICU 12 BED BUILD OUT is a renovation/alteration project at 919 E. 32ND ST., Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Dec 2016). The project has an estimated value of $3.2M.
๐Project Metrics
TDLR #EABPRJB6817712Project Closed
Project has been completed and closed
SDMC ICU 12 BED BUILD OUT is a Renovation/Alteration project located at 919 E. 32ND ST., Austin, TX 78765 in Austin, Texas. The project has an estimated value of $3.2M. ST. DAVID'S MEDICAL CENTER is the property owner and PERKINS+WILL is the design firm of record. The project was registered with TDLR on June 1, 2016.
โFrequently Asked Questions
What is SDMC ICU 12 BED BUILD OUT?
SDMC ICU 12 BED BUILD OUT is a renovation/alteration project at 919 E. 32ND ST. in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Add 12 additional ICU beds in existing shelled space
Is SDMC ICU 12 BED BUILD OUT open in Austin?
Construction on SDMC ICU 12 BED BUILD OUT is complete โ TDLR records show the project passed its required accessibility inspection in Dec 2016. The building is finished and very likely open.
Where is SDMC ICU 12 BED BUILD OUT located?
SDMC ICU 12 BED BUILD OUT is located at 919 E. 32ND ST., Austin, TX, 78765, in Travis County.
Who is the owner or developer of SDMC ICU 12 BED BUILD OUT?
ST. DAVID'S MEDICAL CENTER is the property owner/developer of record for SDMC ICU 12 BED BUILD OUT, per its TDLR project registration.
Who is the architect or design firm for SDMC ICU 12 BED BUILD OUT?
PERKINS+WILL is the design firm of record for SDMC ICU 12 BED BUILD OUT, according to its TDLR filing.
How much does SDMC ICU 12 BED BUILD OUT cost and how big is it?
SDMC ICU 12 BED BUILD OUT has an estimated construction value of $3.2M, based on its TDLR filing.
๐Scope of Work
Add 12 additional ICU beds in existing shelled space
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Jun 1, 2016
Review Complete
Inspection Complete
Closed
Dec 1, 2016
๐Related Projects
๐คSame Owner
$683.7M total๐Nearby Projects
Within 1 km๐Related City Permits
Building permits found at or near this location
ePlan: Commercial Expedited Review - Interior Remodel to Existing 2nd Level Areas in Hospital Phase II.
ePlan: Commercial Expedited Review - Remodel Hospital - Level 2 - Sterilizer Equipment Replacement (430 SF).
ePlan: Commercial Expedited Review - Remodel Hospital - Level 2 - Sterilizer Equipment Replacement (430 SF).
Interior Remodel [15-25 Day Review]
ePlan: Commercial Expedited Review - Interior Remodel to Existing 2nd Level Areas in Hospital (250000 SF)
๐Related Site Plans
City of Austin site plan approvals at this location