SHIRO RESTAURANT
๐Project Metrics
TDLR #EABPRJA9801240Project Closed
Project has been completed and closed
๐Scope of Work
New restaurant location existing shopping center
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐Related Projects
๐๏ธSame Design Firm
$841K total๐Related City Permits
Building permits found at or near this location
New Construction Plumbing 1800 sq. ft. ETJ
Direct Access Drain System Repair The diagnostic revealed a broken 3ยฟ wye under the stairwell. To address this we will utilize specialized equipment to create a direct access entry hole in the utility room then tunnel approximately 7 feet under the stairwell to expose the damaged area. Once exposed the defective drains will be removed from the plumbing system and all debris will be hauled away. New DWV Schedule 40 PVC pipe and fittings will be installed in accordance with plumbing code. A static test will then be performed on the entire drain system to ensure there are no further leaks. If additional leaks are detected an extra pinpoint will be required to isolate the break(s) and a separate estimate will be presented for the necessary repairs. Should additional access be required or if unforeseen conditions such as solid rock roots or other obstructions are encountered a supplemental estimate will be provided to accommodate the extra time and materials needed to complete the job.
Express: replace four windows like for like
express - existing foundation repair as per scope of work attached
New Construction of SFR in ETJ Ref: Master Meter Tap 2024-055899 W