FIRST LEAP
FIRST LEAP is a renovation/alteration project at 9607 RESEARCH BLVD, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Nov 2012). The project has an estimated value of $300K.
๐Project Metrics
TDLR #EABPRJB3800713Project Closed
Project has been completed and closed
FIRST LEAP is a Renovation/Alteration project located at 9607 RESEARCH BLVD, Austin, TX 78758 in Austin, Texas. The project has an estimated value of $300K. GATEWAY SQUARE LLC is the property owner and DICK CLARK ARCHITECTURE is the design firm of record. The project was registered with TDLR on September 17, 2012.
โFrequently Asked Questions
What is FIRST LEAP?
FIRST LEAP is a renovation/alteration project at 9607 RESEARCH BLVD in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: 2nd floor interior finish out of existing bldg includingshell work, new partition walls.
Is FIRST LEAP open in Austin?
Construction on FIRST LEAP is complete โ TDLR records show the project passed its required accessibility inspection in Nov 2012. The building is finished and very likely open.
Where is FIRST LEAP located?
FIRST LEAP is located at 9607 RESEARCH BLVD, Austin, TX, 78758, in Travis County.
Who is the owner or developer of FIRST LEAP?
GATEWAY SQUARE LLC is the property owner/developer of record for FIRST LEAP, per its TDLR project registration.
Who is the architect or design firm for FIRST LEAP?
DICK CLARK ARCHITECTURE is the design firm of record for FIRST LEAP, according to its TDLR filing.
How much does FIRST LEAP cost and how big is it?
FIRST LEAP has an estimated construction value of $300K, based on its TDLR filing.
๐Scope of Work
2nd floor interior finish out of existing bldg includingshell work, new partition walls.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Sep 17, 2012
Review Complete
Inspection Complete
Closed
Nov 1, 2012
๐Related Projects
๐คSame Owner
$3.3M total๐๏ธSame Design Firm
$8.3M total๐Nearby Projects
Within 1 km๐Related City Permits
Building permits found at or near this location
Interior retail tenant improvement including finishes
Replacement of complete existing central heat and air system with or without duct work
Tunnel sewer line repair underneath the foundation of the home roughly 5ft
Replacement of an existing water heater 50gal hybrid electric
power pole for new house outside Austin
๐Related Site Plans
City of Austin site plan approvals at this location