Ulta Beauty #75
Ulta Beauty #75 is a renovation/alteration project at 9607 Research Blvd Suite 600, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Sep 2023). The project has an estimated value of $708K across about 12,060 sq ft.
๐Project Metrics
TDLR #TABS2023017724Inspection Complete
Final inspection completed, awaiting project closure
Ulta Beauty #75 is a Renovation/Alteration project located at 9607 Research Blvd Suite 600, Austin, TX 78759 in Austin, Texas. The project has an estimated value of $708K covering 12,060 sq ft. GATEWAY SQUARE LLC is the property owner. The project was registered with TDLR on April 27, 2023.
โFrequently Asked Questions
What is Ulta Beauty #75?
Ulta Beauty #75 is a renovation/alteration project at 9607 Research Blvd Suite 600 in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: INTERIOR REMODELING /BUILD-OUT OF A MERCANTILE/ INTERIOR SPACE CONTAINED WITHIN AN EXISTING SHELL BUILDING
Is Ulta Beauty #75 open in Austin?
Construction on Ulta Beauty #75 is complete โ TDLR records show the project passed its required accessibility inspection in Sep 2023. The building is finished and very likely open.
Where is Ulta Beauty #75 located?
Ulta Beauty #75 is located at 9607 Research Blvd Suite 600, Austin, TX, 78759, in Travis County.
Who is the owner or developer of Ulta Beauty #75?
GATEWAY SQUARE LLC is the property owner/developer of record for Ulta Beauty #75, per its TDLR project registration.
How much does Ulta Beauty #75 cost and how big is it?
Ulta Beauty #75 has an estimated construction value of $708K and approximately 12,060 square feet (about $59/sqft), based on its TDLR filing.
๐Scope of Work
INTERIOR REMODELING /BUILD-OUT OF A MERCANTILE/ INTERIOR SPACE CONTAINED WITHIN AN EXISTING SHELL BUILDING
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Apr 27, 2023
Review Complete
Inspection Complete
Sep 29, 2023
Closed
๐Related Projects
๐คSame Owner
$3.3M total๐Related City Permits
Building permits found at or near this location
Replacement of complete existing central heat and air system with or without duct work
power pole for new house outside Austin
Tunnel sewer line repair underneath the foundation of the home roughly 5ft
Interior retail tenant improvement including finishes
Replacement of an existing water heater 50gal hybrid electric