ZCOUTURE
ZCOUTURE is a renovation/alteration project at 9503 RESEARCH BLVD Bldg 3 Ste 300, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Currently under construction. The project has an estimated value of $180K.
๐Project Metrics
TDLR #EABPRJB8812759Project Registered
Project has been registered with TDLR and is in pre-construction phase
ZCOUTURE is a Renovation/Alteration project located at 9503 RESEARCH BLVD Bldg 3 Ste 300, Austin, TX 78759 in Austin, Texas. The project has an estimated value of $180K. GATEWAY SQUARE LLC is the property owner and DESIGN CENTEX BLUEPRINT is the design firm of record. The project was registered with TDLR on March 17, 2018.
โFrequently Asked Questions
What is ZCOUTURE?
ZCOUTURE is a renovation/alteration project at 9503 RESEARCH BLVD Bldg 3 Ste 300 in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Finish out inside and existing building shell at a stripmall.
Is ZCOUTURE open in Austin?
ZCOUTURE is currently under construction in Austin, TX. Its current TDLR status is "Project Registered".
Where is ZCOUTURE located?
ZCOUTURE is located at 9503 RESEARCH BLVD Bldg 3 Ste 300, Austin, TX, 78759, in Travis County.
Who is the owner or developer of ZCOUTURE?
GATEWAY SQUARE LLC is the property owner/developer of record for ZCOUTURE, per its TDLR project registration.
Who is the architect or design firm for ZCOUTURE?
DESIGN CENTEX BLUEPRINT is the design firm of record for ZCOUTURE, according to its TDLR filing.
How much does ZCOUTURE cost and how big is it?
ZCOUTURE has an estimated construction value of $180K, based on its TDLR filing.
๐Scope of Work
Finish out inside and existing building shell at a stripmall.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Mar 17, 2018
Review Complete
Inspection Complete
Closed
๐Related Projects
๐คSame Owner
$3.3M total๐Related City Permits
Building permits found at or near this location
Express- Remove and replace 6 windows size for size. No modification to structure or framing
Full UG Service Meter Riser and Panel 150A
Express: Foundation repair - Install 24 piers around the foundation of the home; Tunnel 70 ft to replace sewer line
Replacement of an existing water heater Replace 40-gallon Electric Water Heater Location: interior closet
Change out sewer line under the house via tunnel and sewer yard line