SMSC PHASE 2
SMSC PHASE 2 is a renovation/alteration project at 10900 STONE LAKE BLVD., Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jan 2009). The project has an estimated value of $90K.
๐Project Metrics
TDLR #EABPRJA9801647Project Closed
Project has been completed and closed
SMSC PHASE 2 is a Renovation/Alteration project located at 10900 STONE LAKE BLVD., Austin, TX 78759 in Austin, Texas. The project has an estimated value of $90K. PRINCIPLE REAL ESTATE INVESTORS is the property owner and SUSMAN TISDALE GAYLE ARCHITECTS is the design firm of record. The project was registered with TDLR on September 30, 2008.
โFrequently Asked Questions
What is SMSC PHASE 2?
SMSC PHASE 2 is a renovation/alteration project at 10900 STONE LAKE BLVD. in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: renovation/ alteration
Is SMSC PHASE 2 open in Austin?
Construction on SMSC PHASE 2 is complete โ TDLR records show the project passed its required accessibility inspection in Jan 2009. The building is finished and very likely open.
Where is SMSC PHASE 2 located?
SMSC PHASE 2 is located at 10900 STONE LAKE BLVD., Austin, TX, 78759, in Travis County.
Who is the owner or developer of SMSC PHASE 2?
PRINCIPLE REAL ESTATE INVESTORS is the property owner/developer of record for SMSC PHASE 2, per its TDLR project registration.
Who is the architect or design firm for SMSC PHASE 2?
SUSMAN TISDALE GAYLE ARCHITECTS is the design firm of record for SMSC PHASE 2, according to its TDLR filing.
How much does SMSC PHASE 2 cost and how big is it?
SMSC PHASE 2 has an estimated construction value of $90K, based on its TDLR filing.
๐Scope of Work
renovation/ alteration
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Sep 30, 2008
Review Complete
Inspection Complete
Closed
Jan 1, 2009
๐Related Projects
๐๏ธSame Design Firm
$15.3M total๐Nearby Projects
Within 1 km๐Related City Permits
Building permits found at or near this location
Interior remodel to existing office PR 2025 123948 / BP 2025 133362 will be withdrawn once this BP is issued as the PR above is a QT and cant be revised but it has existing inspections that need to be transferred over.
Express: Foundation repair
Replacement of complete existing central heat and air system with or without duct work hvac change out
INTERIOR FULL FINISH OUT. EXISTING DRYWALL IS GUTTED AND CEILINGS EXPOSED. INTERIOR/EXTERIOR DOOR REPLACEMENT CABINETS DRYEWALL NEW ENGINEERED STAIRWELL RELOCATE WINDOW REPLACEMENT SHOWER RECONFIGURATION POWDER BATH AND UTILITY ROOM RECONFIGURATION. LIGHTING REPLACEMENT ONLY.
Install Tesla EV Charger
๐Related Site Plans
City of Austin site plan approvals at this location
Property Owner
Design Firm
Location Intelligence
Active businesses near this construction site
Holiday Inn Express & Suites Austin NW - Arboretum Area by IHG
0.3 miBusiness data from Google