SPEC SUITE 500
SPEC SUITE 500 is a renovation/alteration project at 2100 KRAMER LANE Suite 500, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jan 2009). The project has an estimated value of $71K.
๐Project Metrics
TDLR #EABPRJA9804038Project Closed
Project has been completed and closed
SPEC SUITE 500 is a Renovation/Alteration project located at 2100 KRAMER LANE Suite 500, Austin, TX 78758 in Austin, Texas. The project has an estimated value of $71K. ENDEAVOR REAL ESTATE GROUP is the property owner and SIXTH RIVER ARCHITECTS is the design firm of record. The project was registered with TDLR on November 12, 2008.
โFrequently Asked Questions
What is SPEC SUITE 500?
SPEC SUITE 500 is a renovation/alteration project at 2100 KRAMER LANE Suite 500 in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Interior renovation of existing tenant lease space
Is SPEC SUITE 500 open in Austin?
Construction on SPEC SUITE 500 is complete โ TDLR records show the project passed its required accessibility inspection in Jan 2009. The building is finished and very likely open.
Where is SPEC SUITE 500 located?
SPEC SUITE 500 is located at 2100 KRAMER LANE Suite 500, Austin, TX, 78758, in Travis County.
Who is the owner or developer of SPEC SUITE 500?
ENDEAVOR REAL ESTATE GROUP is the property owner/developer of record for SPEC SUITE 500, per its TDLR project registration.
Who is the architect or design firm for SPEC SUITE 500?
SIXTH RIVER ARCHITECTS is the design firm of record for SPEC SUITE 500, according to its TDLR filing.
How much does SPEC SUITE 500 cost and how big is it?
SPEC SUITE 500 has an estimated construction value of $71K, based on its TDLR filing.
๐Scope of Work
Interior renovation of existing tenant lease space
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Nov 12, 2008
Review Complete
Inspection Complete
Closed
Jan 1, 2009
๐Related Projects
๐คSame Owner
$777.1M total๐Nearby Projects
Within 1 km๐Related City Permits
Building permits found at or near this location
Perform an air-pressure gas leak test by shutting down the gas supply and pressurizing the lines with air. Includes monitoring the system to help diagnose the source of gas leaks. *Unit I
Replacement of complete existing central heat and air system with or without duct work
New pool and spa
Express: foundation repair
stand alone tpole permit related to 2025-158772 EP