THE BUCKLE
THE BUCKLE is a renovation/alteration project at 11010 DOMAIN DRIVE Suite 108, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jan 2010). The project has an estimated value of $240K.
๐Project Metrics
TDLR #EABPRJA9815705Project Closed
Project has been completed and closed
THE BUCKLE is a Renovation/Alteration project located at 11010 DOMAIN DRIVE Suite 108, Austin, TX 78757 in Austin, Texas. The project has an estimated value of $240K. SIMON PROPERTY GROUP is the property owner and PDMS DESIGN GROUP is the design firm of record. The project was registered with TDLR on July 31, 2009.
โFrequently Asked Questions
What is THE BUCKLE?
THE BUCKLE is a renovation/alteration project at 11010 DOMAIN DRIVE Suite 108 in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Tenant improvement to an new lease space.
Is THE BUCKLE open in Austin?
Construction on THE BUCKLE is complete โ TDLR records show the project passed its required accessibility inspection in Jan 2010. The building is finished and very likely open.
Where is THE BUCKLE located?
THE BUCKLE is located at 11010 DOMAIN DRIVE Suite 108, Austin, TX, 78757, in Travis County.
Who is the owner or developer of THE BUCKLE?
SIMON PROPERTY GROUP is the property owner/developer of record for THE BUCKLE, per its TDLR project registration.
Who is the architect or design firm for THE BUCKLE?
PDMS DESIGN GROUP is the design firm of record for THE BUCKLE, according to its TDLR filing.
How much does THE BUCKLE cost and how big is it?
THE BUCKLE has an estimated construction value of $240K, based on its TDLR filing.
๐Scope of Work
Tenant improvement to an new lease space.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Jul 31, 2009
Review Complete
Inspection Complete
Closed
Jan 1, 2010
๐Related Projects
๐คSame Owner
$163.2M total๐๏ธSame Design Firm
$590.3M total๐Nearby Projects
Within 1 km๐Related City Permits
Building permits found at or near this location
Replacement of complete existing central heat and air system with or without duct work
Replace mast and point of attachment damaged by a fallen tree limb. Service drop conductors may need to be extended to reach the new mast.
8 foot tunnel 2 foot sewer line repair
Replacement of complete existing central heat and air system with or without duct work
express: foundation repair