PARKING GARAGE ADDITION AND RENOVATION
๐Project Metrics
TDLR #EABPRJB0805781Project Closed
Project has been completed and closed
๐Scope of Work
Add 2 levels to existing parking structure. Alterationsto provided segregated physician parking, add 2 standpip
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐Related Projects
๐คSame Owner
$1.3M total๐๏ธSame Design Firm
$9.8M total๐Related City Permits
Building permits found at or near this location
Remodel Hospital -Boiler Replacement
ePlan Review: New O2 Park SP-2024-0413C - In Review
Disconnect/Reconnect 758018 - Switch Gear Maintenance serves entire bldg
*Austin Energy shuts down only we are going to perform preventative maintenance by cleaning tightening and torquing main switchgear internal components then Austin Energy re-energizes. 788018 - Switchgear maintenance/cleaning switchgear
installation of 50k WAC Ballasted roof top auxiliary power system