MALCO ELECTRIC
๐Project Metrics
TDLR #EABPRJB0815393Project Closed
Project has been completed and closed
๐Scope of Work
ONE STORY, 5000 SQ. FT. BLDG. SHELL TO BE USED FOR RETAIL/OFFICE FINISH OUT. INTERIOR FINISH OUT IS NOT IN THIS
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐Related Projects
๐๏ธSame Design Firm
$5.2M total๐Related City Permits
Building permits found at or near this location
ETJ New Construction of SFR 2864sqft meter Installation
Replacement of complete existing central heat and air system with or without duct work Attic access in hallway.
Replacement of complete existing central heat and air system with or without duct work
Level 2 EV Charger powered by a 60amp Circuit Breaker. Run #6 THHN c.u. & #10 THHN c.u. ground through <5 feet New 3ยฟ4ยฟ EMT conduit to power the Level 2 EV Charger at 48amp constant draw.
Replacement of complete existing central heat and air system with or without duct work