RSS
RSS is a new construction project at LOT 2 BLK 1, CAPITOL SEATING, Belton, in Bell County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Feb 2019). The project has an estimated value of $1.0M.
๐Project Metrics
TDLR #EABPRJB9804377Project Closed
Project has been completed and closed
RSS is a New Construction project located at LOT 2 BLK 1, CAPITOL SEATING, Belton, TX 76513 in Belton, Texas. The project has an estimated value of $1.0M. DON WHITE is the property owner and N-VIZION DESIGN is the design firm of record. The project was registered with TDLR on November 2, 2018.
โFrequently Asked Questions
What is RSS?
RSS is a new construction project at LOT 2 BLK 1, CAPITOL SEATING in Belton, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: TWO STORY 14,165 S.F. PRE-ENGINEERED METAL BUILDING TO BE OCCUPIED AS A WAREHOUSE & RETAIL SPACE FOR LOW-HAZARD
Is RSS open in Belton?
Construction on RSS is complete โ TDLR records show the project passed its required accessibility inspection in Feb 2019. The building is finished and very likely open.
Where is RSS located?
RSS is located at LOT 2 BLK 1, CAPITOL SEATING, Belton, TX, 76513, in Bell County.
Who is the owner or developer of RSS?
DON WHITE is the property owner/developer of record for RSS, per its TDLR project registration.
Who is the architect or design firm for RSS?
N-VIZION DESIGN is the design firm of record for RSS, according to its TDLR filing.
How much does RSS cost and how big is it?
RSS has an estimated construction value of $1.0M, based on its TDLR filing.
๐Scope of Work
TWO STORY 14,165 S.F. PRE-ENGINEERED METAL BUILDING TO BE OCCUPIED AS A WAREHOUSE & RETAIL SPACE FOR LOW-HAZARD
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Nov 2, 2018
Review Complete
Inspection Complete
Closed
Feb 1, 2019
๐Related Projects
๐๏ธSame Design Firm
$96.8M totalProperty Owner
Design Firm
Registered Accessibility Specialist
Explore Area
Find Professionals
Need a contractor for this project?
Browse verified general contractors active in Bell County
Find General Contractors in Bell