1010 CESAR CHAVEZ
1010 CESAR CHAVEZ is a renovation/alteration project at 1010 CESAR CHAVEZ suite 2100, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Dec 2011). The project has an estimated value of $70K.
๐Project Metrics
TDLR #EABPRJB1812413Project Closed
Project has been completed and closed
1010 CESAR CHAVEZ is a Renovation/Alteration project located at 1010 CESAR CHAVEZ suite 2100, Austin, TX 78702 in Austin, Texas. The project has an estimated value of $70K. 1010 CESAR CHAVEZ LTD is the property owner and DICK CLARK ARCHITECTURE is the design firm of record. The project was registered with TDLR on May 20, 2011.
โFrequently Asked Questions
What is 1010 CESAR CHAVEZ?
1010 CESAR CHAVEZ is a renovation/alteration project at 1010 CESAR CHAVEZ suite 2100 in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Interior finish of coffee shop
Is 1010 CESAR CHAVEZ open in Austin?
Construction on 1010 CESAR CHAVEZ is complete โ TDLR records show the project passed its required accessibility inspection in Dec 2011. The building is finished and very likely open.
Where is 1010 CESAR CHAVEZ located?
1010 CESAR CHAVEZ is located at 1010 CESAR CHAVEZ suite 2100, Austin, TX, 78702, in Travis County.
Who is the owner or developer of 1010 CESAR CHAVEZ?
1010 CESAR CHAVEZ LTD is the property owner/developer of record for 1010 CESAR CHAVEZ, per its TDLR project registration.
Who is the architect or design firm for 1010 CESAR CHAVEZ?
DICK CLARK ARCHITECTURE is the design firm of record for 1010 CESAR CHAVEZ, according to its TDLR filing.
How much does 1010 CESAR CHAVEZ cost and how big is it?
1010 CESAR CHAVEZ has an estimated construction value of $70K, based on its TDLR filing.
๐Scope of Work
Interior finish of coffee shop
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
May 20, 2011
Review Complete
Inspection Complete
Closed
Dec 1, 2011
๐Related Projects
๐๏ธSame Design Firm
$8.3M total๐Related City Permits
Building permits found at or near this location
New pool spa and pool deck
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work **STEVE SERNA: Replace existing 2.5-ton vertical gas split system like-for-like; no structural change.
Replacement of complete existing central heat and air system with or without duct work 2.5ton Gas Comfort Replacement
Express: Re-roofing repair bad decking and fascia where necessary. Replace drip edge