JONES ENERGY - PHASE 4
JONES ENERGY - PHASE 4 is a renovation/alteration project at 807 LAS CIMAS PKWY, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Aug 2011). The project has an estimated value of $155K.
๐Project Metrics
TDLR #EABPRJB1812529Project Closed
Project has been completed and closed
JONES ENERGY - PHASE 4 is a Renovation/Alteration project located at 807 LAS CIMAS PKWY, Austin, TX 78746 in Austin, Texas. The project has an estimated value of $155K. ENDEAVOR REAL ESTATE GROUP is the property owner and STG DESIGN is the design firm of record. The project was registered with TDLR on May 24, 2011.
โFrequently Asked Questions
What is JONES ENERGY - PHASE 4?
JONES ENERGY - PHASE 4 is a renovation/alteration project at 807 LAS CIMAS PKWY in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Expansion for Jones Energy. Demolishing and modificationof existing offices. New finishes, new ceiling and ligh
Is JONES ENERGY - PHASE 4 open in Austin?
Construction on JONES ENERGY - PHASE 4 is complete โ TDLR records show the project passed its required accessibility inspection in Aug 2011. The building is finished and very likely open.
Where is JONES ENERGY - PHASE 4 located?
JONES ENERGY - PHASE 4 is located at 807 LAS CIMAS PKWY, Austin, TX, 78746, in Travis County.
Who is the owner or developer of JONES ENERGY - PHASE 4?
ENDEAVOR REAL ESTATE GROUP is the property owner/developer of record for JONES ENERGY - PHASE 4, per its TDLR project registration.
Who is the architect or design firm for JONES ENERGY - PHASE 4?
STG DESIGN is the design firm of record for JONES ENERGY - PHASE 4, according to its TDLR filing.
How much does JONES ENERGY - PHASE 4 cost and how big is it?
JONES ENERGY - PHASE 4 has an estimated construction value of $155K, based on its TDLR filing.
๐Scope of Work
Expansion for Jones Energy. Demolishing and modificationof existing offices. New finishes, new ceiling and ligh
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
May 24, 2011
Review Complete
Inspection Complete
Closed
Aug 1, 2011
๐Related Projects
๐คSame Owner
$777.1M total๐Nearby Projects
Within 1 km๐Related City Permits
Building permits found at or near this location
Interior remodel existing admin office
25 trench for sewer line replacement from right side of home to city tap.
Express: Replace 3 windows like for like
Installation of new 200a overhead riser 200R Meter can and 200a Main Breaker Panel - Remove existing aged equipment
Express: siding replacement around exterior and behind electrical box