KRIMMENI TECHNOLOGIES
KRIMMENI TECHNOLOGIES is a renovation/alteration project at 805 LAS CIMAS PKWY #305, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Mar 2015). The project has an estimated value of $115K.
๐Project Metrics
TDLR #EABPRJB5807123Project Closed
Project has been completed and closed
KRIMMENI TECHNOLOGIES is a Renovation/Alteration project located at 805 LAS CIMAS PKWY #305, Austin, TX 78746 in Austin, Texas. The project has an estimated value of $115K. ENDEAVOR is the property owner and AO3 INC. is the design firm of record. The project was registered with TDLR on December 24, 2014.
โFrequently Asked Questions
What is KRIMMENI TECHNOLOGIES?
KRIMMENI TECHNOLOGIES is a renovation/alteration project at 805 LAS CIMAS PKWY #305 in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Remodel of existing office space on multitenant floor
Is KRIMMENI TECHNOLOGIES open in Austin?
Construction on KRIMMENI TECHNOLOGIES is complete โ TDLR records show the project passed its required accessibility inspection in Mar 2015. The building is finished and very likely open.
Where is KRIMMENI TECHNOLOGIES located?
KRIMMENI TECHNOLOGIES is located at 805 LAS CIMAS PKWY #305, Austin, TX, 78746, in Travis County.
Who is the owner or developer of KRIMMENI TECHNOLOGIES?
ENDEAVOR is the property owner/developer of record for KRIMMENI TECHNOLOGIES, per its TDLR project registration.
Who is the architect or design firm for KRIMMENI TECHNOLOGIES?
AO3 INC. is the design firm of record for KRIMMENI TECHNOLOGIES, according to its TDLR filing.
How much does KRIMMENI TECHNOLOGIES cost and how big is it?
KRIMMENI TECHNOLOGIES has an estimated construction value of $115K, based on its TDLR filing.
๐Scope of Work
Remodel of existing office space on multitenant floor
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Dec 24, 2014
Review Complete
Inspection Complete
Closed
Mar 1, 2015
๐Related Projects
๐คSame Owner
$62.0M total๐๏ธSame Design Firm
$32.1M total๐Nearby Projects
Within 1 km๐Related City Permits
Building permits found at or near this location
Replacement of complete existing central heat and air system with or without duct work REPLACE EXISTING HVAC SYSTEM
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work