HEB #475 FUEL STATION KIOSK RENOVATION
๐Project Metrics
TDLR #EABPRJB1812753Project Closed
Project has been completed and closed
๐Scope of Work
Renovation of existing sales kiosk at an existing fuel station. No site work or other elements of the existing
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐Related Projects
๐คSame Owner
$450K total๐Related City Permits
Building permits found at or near this location
New SFR in ETJ (wastewater only)
Interior remodel existing 2nd floor office areas at existing semi conductor manufacturing facility
Replacement of complete existing central heat and air system with or without duct work Thomas Talley: Replacement of a 5-Ton horizontal like-for-like gas system
Express: Interior bathroom remodel including tub to shower conversion replacement of vanity and toilet in existing locations. Installation of new wall and floor tile and replacement of light fixture using existing wiring. No structural changes. No wall relocation or removal. Plumbing fixtures remain within the existing bathroom footprint.
Express: Interior bathroom remodel including tub to shower conversion replacement of vanity and toilet in existing locations. Installation of new wall and floor tile and replacement of light fixture using existing wiring. No structural changes. No wall relocation or removal. Plumbing fixtures remain within the existing bathroom footprint.