Design review complete, construction may proceed
Elgin Elementary School MEP Upgrades Phase 3 is a Renovation/Alteration project located at 1005 W 2nd St, Elgin, TX 78704 in Elgin, Texas. The project has an estimated value of $3.7M covering 41,300 sq ft. Elgin I S D is the property owner and O'Connell Robertson is the design firm of record. The project was registered with TDLR on February 16, 2026.
Replace (5) air handling unit systems and replace all ductwork served by units.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Filed
Feb 16, 2026
Review Complete
Feb 18, 2026
Inspection Complete
Closed
2d
Review duration
Building permits found at or near this location
AE 200 amp overhead meter loop on pole detach from new build REF 2025-030999 BP
New in ground pool
Replacement of complete existing central heat and air system with or without duct work
Expansion of existing pool. 2/18/26 IM NEW POOL BUILD NO EXISTING POOL ON SITE
Expansion of existing pool. 2/18/26 IM NEW POOL BUILD NO EXISTING POOL ON SITE