Project intelligenceTDLR TABS2024020531Renovation/Alteration
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

Elgin ISD | Modular Building Relocation & Renovation

1002 N. Avenue C, Elgin, TX, 78621

Construction complete · Jun 2025Inspection Complete

Elgin ISD | Modular Building Relocation & Renovation is a renovation/alteration project at 1002 N. Avenue C, Elgin, in Bastrop County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jun 2025). The project has an estimated value of $270K across about 3,932 sq ft.

Estimated project value
$270K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
3,932 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$69/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
11 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Jun 11, 2024355 days across supplied datesJun 1, 2025

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    13 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Inspection complete · TDLR filing

    The filing records completion of the accessibility inspection.

    342 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record

📰About Elgin ISD | Modular Building Relocation & Renovation

Elgin ISD | Modular Building Relocation & Renovation

The Elgin ISD | Modular Building Relocation & Renovation project at 1002 N. Avenue C in Elgin, Bastrop County, is complete. This 3,932 sq ft renovation and alteration work involved moving and modifying a modular building to ensure accessibility compliance. Elgin ISD was the owner, and Huckabee served as the design firm. The registered accessibility specialist was Ross A Thomas. The project was registered with TDLR in June 2024.

The estimated cost for this project was $270,000, resulting in a cost of $69 per square foot. Construction started in June 2024, with a scheduled completion date of June 2025. The build window of 342 days was longer than the Bastrop County median of 102 days for similar renovations. The cost was close to the county median of $300,000, but the per-square-foot cost was below the county median of $122.

The site is located outside the FEMA Special Flood Hazard Area (zone X). The project involved public funds and public land. Elgin ISD has other registered projects, including the Homestead CTE Conversion and Elgin Middle School #2. Huckabee has also designed projects like Venus High School and Jarrell ISD Atlas Ranch Elementary School.

The building passed its final TDLR accessibility inspection in June 2025, so construction is complete. This status confirms that all regulatory requirements for the accessibility modifications have been satisfied. The project represents a focused effort to enhance accessibility within the district's existing infrastructure, ensuring compliance while managing costs effectively in the Elgin community.

This completion marks the end of the relocation and renovation work. The project's timeline and cost structure reflect the specific needs of the modular building alteration. The involvement of a registered accessibility specialist ensured that the final structure met all state standards for accessibility.

Inspection Complete

Final inspection completed, awaiting project closure

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 78621 (Elgin)

One email per change. Unsubscribe in one click. Privacy.

Elgin ISD | Modular Building Relocation & Renovation is a Renovation/Alteration project located at 1002 N. Avenue C, Elgin, TX 78621 in Elgin, Texas. The project has an estimated value of $270K covering 3,932 sq ft. Elgin ISD is the property owner and Huckabee is the design firm of record. The project was registered with TDLR on June 11, 2024.

Frequently Asked Questions

What is the status of the Elgin ISD modular building project?

The project is complete. The building passed its final TDLR accessibility inspection in June 2025. Construction began in June 2024 and concluded within the scheduled timeframe.

Who designed the Elgin ISD modular building renovation?

Huckabee served as the design firm of record for this renovation and alteration project located at 1002 N. Avenue C in Elgin.

What was the total estimated cost of this project?

The estimated cost for the modular building relocation and renovation was $270,000. This covers the 3,932 sq ft structure and associated accessibility alterations.

Is the building located in a flood zone?

No. The site is outside the FEMA Special Flood Hazard Area (zone X).

Has the business opened for customers?

The TDLR record covers construction only and does not record whether the business has started serving customers. The page confirms construction completion but not operational status.

What is Elgin ISD | Modular Building Relocation & Renovation?

Elgin ISD | Modular Building Relocation & Renovation is a renovation/alteration project at 1002 N. Avenue C in Elgin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Elgin ISD | Modular Building Relocation & Renovation

Is Elgin ISD | Modular Building Relocation & Renovation open in Elgin?

Construction on Elgin ISD | Modular Building Relocation & Renovation is complete — TDLR records show the project passed its required accessibility inspection in Jun 2025. The building is finished and very likely open.

Where is Elgin ISD | Modular Building Relocation & Renovation located?

Elgin ISD | Modular Building Relocation & Renovation is located at 1002 N. Avenue C, Elgin, TX, 78621, in Bastrop County.

Who is the owner or developer of Elgin ISD | Modular Building Relocation & Renovation?

Elgin ISD is the property owner/developer of record for Elgin ISD | Modular Building Relocation & Renovation, per its TDLR project registration.

Who is the architect or design firm for Elgin ISD | Modular Building Relocation & Renovation?

Huckabee is the design firm of record for Elgin ISD | Modular Building Relocation & Renovation, according to its TDLR filing.

How much does Elgin ISD | Modular Building Relocation & Renovation cost and how big is it?

Elgin ISD | Modular Building Relocation & Renovation has an estimated construction value of $270K and approximately 3,932 square feet (about $69/sqft), based on its TDLR filing.

Scope of Work

Elgin ISD | Modular Building Relocation & Renovation

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

1002 N. Avenue C, Elgin, TX, 78621

Loading location map…
30.35257, -97.37761

Related City Permits

Building permits found at or near this location

1002 FLORADALE DR
17.93 mi away

Express: Remove and replace 3 windows (like for like)

ActiveBuilding PermitRepairOct 2026
$1
View Details
2026-135259 BP
Window Nation LLC**Main**
1002 KAREN AVE
20.69 mi away

New 1-Story addition to enlarge kitchen and enclose back patio add uncovered wood deck partial garage conversion to laundry room Demo as noted in plans. Full kitchen remodel remodel 3 bathrooms to 3.5 move water heater concrete HVAC plumbing and electrical as needed to remodel kitchen.

ActiveMechanical PermitAddition and RemodelSep 2026
View Details
2024-142711 MP
Jurnee Mechanical and Services
1002 W 26TH ST
22.52 mi away

2026/11/06 | Hunting themed invite only event #Greek

ActiveBuilding PermitNewNov 2026
View Details
2026-142558 BP
1002 W 26TH ST
22.52 mi away

2026/11/06 | Hunting themed invite only event #Greek

ActiveBuilding PermitNewNov 2026
View Details
2026-142546 BP
1002 W 26TH ST
22.52 mi away

2026/11/06 | Hunting themed invite only event #Greek

ActiveBuilding PermitNewNov 2026
View Details
2026-142550 BP

Watch all construction in 78621 (Elgin)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.