Inspection Complete🔧 Renovation/Alteration💵 This project involves public funds, public land, or is a Federally funded roadway project.

Elgin ISD | Modular Building Relocation & Renovation

1002 N. Avenue C, Elgin, TX 78621, Elgin, TX, 78621
Final Inspection85%

📊Project Metrics

TDLR #TABS2024020531
$270K
Project Value
3,932
Square Feet
$69/sqft
Cost/SqFt
11 months
Duration
Registered:Jun 11, 2024
Start:Jun 24, 2024
Target:Jun 1, 2025

Inspection Complete

Final inspection completed, awaiting project closure

📋Scope of Work

Elgin ISD | Modular Building Relocation & Renovation

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

📅Compliance Timeline

Project Registered
June 11, 2024
Construction Start
June 24, 2024
Expected Completion
June 1, 2025

📄Related City Permits

Building permits found at or near this location

10025 PLANTERS WOODS DR

Install 60 Amp circuit for EV wall connector in garage.

ActiveElectrical PermitSpecial Inspections ProgramDec 2025
View Details
2025-160294 EP
🔧Bedwell Electric LLC
10028 ANAHUAC TRL

New irrigation install

ActivePlumbing PermitIrrigationDec 2025
View Details
2025-159206 PP
10025 ALTERRA PKWY UNIT 100

Initial tenant improvement of first-level suite to create B occupancy office space with meeting rooms employee break room and open office.

ActivePlumbing PermitRemodelDec 2025
View Details
2025-150231 PP
🔧STELLAR PLUMBING INC
10025 ALTERRA PKWY

o Enterprise Electrical will furnish and install new specified light fixtures. ¿ Per Sheet E2.01 and E0.03 Luminaire Schedule o Enterprise Electrical will install and program all lighting controls as specified. ¿ Per Sheet E2.01 Lighting Control System Notes and Sequence of Operation. o Enterprise Electrical will furnish and install new controlled duplex and GFCI receptacles as listed. ¿ Per Sheet E1-01 o Enterprise Electrical will install new branch circuitry and home runs for power lighting and all equipment. ¿ Per Sheet E1-01 o Enterprise Electrical will furnish and install new floor boxes with Data pathway. ¿ Per Sheet E1-01 o Enterprise Electrical will furnish and install data boxes and conduits. ¿ Per Sheet E1-0 Drawing Notes 5 o Enterprise Electrical will scan and concrete cutting for poke through floor box. ¿ Per Sheet E1-01 o Enterprise Electrical will furnish and install 4 new furniture system wall feeds with connection and termination. ¿ Per Sheet E1-01 Drawing Notes 2 o Enterprise Electrical will furnish and install rough in boxes and conduit for Security Door/Card Readers. ¿ Per Sheet E1-01 Drawing Notes 3 o Enterprise Electrical will furnish and install disconnect of the below mechanical equipment. ¿ WH-A ¿ TP-A ¿ DOAS-1 ¿ CU-1-2 ¿ FCU1-10 ¿ FCU1-11 ¿ FCU1-12 ¿ FCU1-13 ¿ FCU1-14 ¿ FCU1-15 ¿ FCU1-16 ¿ FCU1-17 ¿ FCU1-18 ¿ FCU1-19 ¿ BS-1 ¿ BS-2 ¿ CU-1-20 ¿ FCU-1-20 ¿ CU-1-21 ¿ FCU-1-21 ¿ Per Sheet E03-01 Mechanical/Plumbing Equipment Connection Schedule o Enterprise Electrical will furnish and install the below listed distribution equipment. ¿ Panel H1T ¿ Panel LCLA ¿ 75 KVA Transformer ¿ Per Sheet E4.00 Electrical Riser Diagram o Enterprise Electrical will furnish and install the fire alarm conduits and back boxes. ¿ To be determined once fire alarm drawings are furnished.

ActiveElectrical PermitUpgradeDec 2025
View Details
2025-150705 EP
🔧Enterprise Electrical
10025 ALTERRA PKWY UNIT 100

Initial tenant improvement of first-level suite to create B occupancy office space with meeting rooms employee break room and open office.

ActiveBuilding PermitRemodelNov 2025
View Details
2025-150231 BP
🔧Harvey-Cleary Builders ***MAIN***

Quick Actions

TDLR ID: TABS2024020531

Design Firm

🏛️
Huckabee
4 projects · $33.7M
View all projects
11501 Alterra Pkwy, Building 7 Ste. 120, Austin, Texas 78758

Registered Accessibility Specialist

📋
ROSS A,THOMAS
RAS #1241
1407 W UNIVERSITY DR, MCKINNEY, TX 75069