212 E. ABRAM
212 E. ABRAM is a renovation/alteration project at 212 E. ABRAM, Arlington, in Tarrant County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jun 2013). The project has an estimated value of $200K.
๐Project Metrics
TDLR #EABPRJB2800067Project Closed
Project has been completed and closed
212 E. ABRAM is a Renovation/Alteration project located at 212 E. ABRAM, Arlington, TX 76010 in Arlington, Texas. The project has an estimated value of $200K. CHARLES W. GREEN is the property owner and NZ ARCHITECT is the design firm of record. The project was registered with TDLR on September 2, 2011.
โFrequently Asked Questions
What is 212 E. ABRAM?
212 E. ABRAM is a renovation/alteration project at 212 E. ABRAM in Arlington, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Remodel
Is 212 E. ABRAM open in Arlington?
Construction on 212 E. ABRAM is complete โ TDLR records show the project passed its required accessibility inspection in Jun 2013. The building is finished and very likely open.
Where is 212 E. ABRAM located?
212 E. ABRAM is located at 212 E. ABRAM, Arlington, TX, 76010, in Tarrant County.
Who is the owner or developer of 212 E. ABRAM?
CHARLES W. GREEN is the property owner/developer of record for 212 E. ABRAM, per its TDLR project registration.
Who is the architect or design firm for 212 E. ABRAM?
NZ ARCHITECT is the design firm of record for 212 E. ABRAM, according to its TDLR filing.
How much does 212 E. ABRAM cost and how big is it?
212 E. ABRAM has an estimated construction value of $200K, based on its TDLR filing.
๐Scope of Work
Remodel
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Sep 2, 2011
Review Complete
Inspection Complete
Closed
Jun 30, 2013