300 E. ABRAM
300 E. ABRAM is a renovation/alteration project at 300 E. ABRAM, Arlington, in Tarrant County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Mar 2011). The project has an estimated value of $200K.
๐Project Metrics
TDLR #EABPRJB1804865Project Closed
Project has been completed and closed
300 E. ABRAM is a Renovation/Alteration project located at 300 E. ABRAM, Arlington, TX 76010 in Arlington, Texas. The project has an estimated value of $200K. 300 E. ABRAM L.L.C. is the property owner and NZ ARCHITECT is the design firm of record. The project was registered with TDLR on December 16, 2010.
โFrequently Asked Questions
What is 300 E. ABRAM?
300 E. ABRAM is a renovation/alteration project at 300 E. ABRAM in Arlington, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Renovate existing building as shell for future tenant lease spaces.
Is 300 E. ABRAM open in Arlington?
Construction on 300 E. ABRAM is complete โ TDLR records show the project passed its required accessibility inspection in Mar 2011. The building is finished and very likely open.
Where is 300 E. ABRAM located?
300 E. ABRAM is located at 300 E. ABRAM, Arlington, TX, 76010, in Tarrant County.
Who is the owner or developer of 300 E. ABRAM?
300 E. ABRAM L.L.C. is the property owner/developer of record for 300 E. ABRAM, per its TDLR project registration.
Who is the architect or design firm for 300 E. ABRAM?
NZ ARCHITECT is the design firm of record for 300 E. ABRAM, according to its TDLR filing.
How much does 300 E. ABRAM cost and how big is it?
300 E. ABRAM has an estimated construction value of $200K, based on its TDLR filing.
๐Scope of Work
Renovate existing building as shell for future tenant lease spaces.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Dec 16, 2010
Review Complete
Inspection Complete
Closed
Mar 1, 2011