MAIN BLDG 3RD FLOOR RESTROOM RENOVATION is a renovation/alteration project at 101 EAST 15TH STREET, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Oct 2012). The project has an estimated value of $158K.
Project has been completed and closed
MAIN BLDG 3RD FLOOR RESTROOM RENOVATION is a Renovation/Alteration project located at 101 EAST 15TH STREET, Austin, TX 78778 in Austin, Texas. The project has an estimated value of $158K. TEXAS WORKFORCE COMMISSION is the property owner and MAYSE AND ASSOCIATES is the design firm of record. The project was registered with TDLR on November 14, 2011.
MAIN BLDG 3RD FLOOR RESTROOM RENOVATION is a renovation/alteration project at 101 EAST 15TH STREET in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: 3rd Floor Men's and Women's Restroom Renovations
Construction on MAIN BLDG 3RD FLOOR RESTROOM RENOVATION is complete โ TDLR records show the project passed its required accessibility inspection in Oct 2012. The building is finished and very likely open.
MAIN BLDG 3RD FLOOR RESTROOM RENOVATION is located at 101 EAST 15TH STREET, Austin, TX, 78778, in Travis County.
TEXAS WORKFORCE COMMISSION is the property owner/developer of record for MAIN BLDG 3RD FLOOR RESTROOM RENOVATION, per its TDLR project registration.
MAYSE AND ASSOCIATES is the design firm of record for MAIN BLDG 3RD FLOOR RESTROOM RENOVATION, according to its TDLR filing.
MAIN BLDG 3RD FLOOR RESTROOM RENOVATION has an estimated construction value of $158K, based on its TDLR filing.
3rd Floor Men's and Women's Restroom Renovations
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Filed
Nov 14, 2011
Review Complete
Inspection Complete
Closed
Oct 1, 2012
Building permits found at or near this location
Replacement of any self-contained packaged units 5 ton RTU change out like for like of RTU gas /package unit.
Interior Remodel Ground level - Kitchen remodel includes removal of some existing non-load bearing closet walls. Doorway cut into existing wall for proposed back kitchen all new appliances cabinetry lighting and plumbing fixtures. Moving plumbing locations. Primary bathroom remodel new shower tub relocated vanity sinks new entry door cut to master closet.
Update the electrical meter and panel
Interior finish-out. SP-2022-0071C
New Single Family residence with 4 bed 2.5 bath and 2 car attached garage
Active businesses near this construction site
Business data from Google