LULING SAFE ROUTES TO SCHOOLS
LULING SAFE ROUTES TO SCHOOLS is a renovation/alteration project at DAVIS @ OAK AND MYRTLE STREETS, Luling, in Caldwell County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jan 2012). The project has an estimated value of $70K.
๐Project Metrics
TDLR #EABPRJB2803960Project Closed
Project has been completed and closed
LULING SAFE ROUTES TO SCHOOLS is a Renovation/Alteration project located at DAVIS @ OAK AND MYRTLE STREETS, Luling, TX 78648 in Luling, Texas. The project has an estimated value of $70K. CITY OF LULING is the property owner and BEFCO ENGINEERING INC. is the design firm of record. The project was registered with TDLR on November 22, 2011.
โFrequently Asked Questions
What is LULING SAFE ROUTES TO SCHOOLS?
LULING SAFE ROUTES TO SCHOOLS is a renovation/alteration project at DAVIS @ OAK AND MYRTLE STREETS in Luling, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Replace existing sidewalks
Is LULING SAFE ROUTES TO SCHOOLS open in Luling?
Construction on LULING SAFE ROUTES TO SCHOOLS is complete โ TDLR records show the project passed its required accessibility inspection in Jan 2012. The building is finished and very likely open.
Where is LULING SAFE ROUTES TO SCHOOLS located?
LULING SAFE ROUTES TO SCHOOLS is located at DAVIS @ OAK AND MYRTLE STREETS, Luling, TX, 78648, in Caldwell County.
Who is the owner or developer of LULING SAFE ROUTES TO SCHOOLS?
CITY OF LULING is the property owner/developer of record for LULING SAFE ROUTES TO SCHOOLS, per its TDLR project registration.
Who is the architect or design firm for LULING SAFE ROUTES TO SCHOOLS?
BEFCO ENGINEERING INC. is the design firm of record for LULING SAFE ROUTES TO SCHOOLS, according to its TDLR filing.
How much does LULING SAFE ROUTES TO SCHOOLS cost and how big is it?
LULING SAFE ROUTES TO SCHOOLS has an estimated construction value of $70K, based on its TDLR filing.
๐Scope of Work
Replace existing sidewalks
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Nov 22, 2011
Review Complete
Inspection Complete
Closed
Jan 1, 2012