Project intelligenceTDLR EABPRJB5806090Renovation/Alteration
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

E. MAIN ST. SIDEWALKS & CURB IMPROVEMENT in Weimar, TX

EAST MAIN @ CENTER STREET TO North Mechanic, Weimar, TX, 78962

Construction complete · May 2015Project Closed

E. MAIN ST. SIDEWALKS & CURB IMPROVEMENT is a renovation/alteration project at EAST MAIN @ CENTER STREET TO North Mechanic, Weimar, in Colorado County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed May 2015). The project has an estimated value of $130K.

Estimated project value
$130K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
Not supplied
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
—
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
3 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Dec 6, 2014146 days across supplied datesMay 1, 2015

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    57 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Project closed · TDLR filing

    The project record was closed in TDLR.

    89 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record

Project Closed

Project has been completed and closed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 78962 (Weimar)

One email per change. Unsubscribe in one click. Privacy.

E. MAIN ST. SIDEWALKS & CURB IMPROVEMENT is a Renovation/Alteration project located at EAST MAIN @ CENTER STREET TO North Mechanic, Weimar, TX 78962 in Weimar, Texas. The project has an estimated value of $130K. CITY OF WEIMAR is the property owner and BEFCO ENGINEERING INC. is the design firm of record. The project was registered with TDLR on December 6, 2014.

Frequently Asked Questions

What is E. MAIN ST. SIDEWALKS & CURB IMPROVEMENT?

E. MAIN ST. SIDEWALKS & CURB IMPROVEMENT is a renovation/alteration project at EAST MAIN @ CENTER STREET TO North Mechanic in Weimar, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Remove and replace curbing and sidewalks, including decorative lighting.

Is E. MAIN ST. SIDEWALKS & CURB IMPROVEMENT open in Weimar?

Construction on E. MAIN ST. SIDEWALKS & CURB IMPROVEMENT is complete — TDLR records show the project passed its required accessibility inspection in May 2015. The building is finished and very likely open.

Where is E. MAIN ST. SIDEWALKS & CURB IMPROVEMENT located?

E. MAIN ST. SIDEWALKS & CURB IMPROVEMENT is located at EAST MAIN @ CENTER STREET TO North Mechanic, Weimar, TX, 78962, in Colorado County.

Who is the owner or developer of E. MAIN ST. SIDEWALKS & CURB IMPROVEMENT?

CITY OF WEIMAR is the property owner/developer of record for E. MAIN ST. SIDEWALKS & CURB IMPROVEMENT, per its TDLR project registration.

Who is the architect or design firm for E. MAIN ST. SIDEWALKS & CURB IMPROVEMENT?

BEFCO ENGINEERING INC. is the design firm of record for E. MAIN ST. SIDEWALKS & CURB IMPROVEMENT, according to its TDLR filing.

How much does E. MAIN ST. SIDEWALKS & CURB IMPROVEMENT cost and how big is it?

E. MAIN ST. SIDEWALKS & CURB IMPROVEMENT has an estimated construction value of $130K, based on its TDLR filing.

Scope of Work

Remove and replace curbing and sidewalks, including decorative lighting.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

EAST MAIN @ CENTER STREET TO North Mechanic, Weimar, TX, 78962

Explore the supplied address

A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.

Location by street address

Watch all construction in 78962 (Weimar)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.