SETON STEPPING STONE SCHOOL
SETON STEPPING STONE SCHOOL is a renovation/alteration project at 301 SETON PARKWAY Suite 103, Round Rock, in Williamson County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed May 2012). The project has an estimated value of $101K.
๐Project Metrics
TDLR #EABPRJB2807207Project Closed
Project has been completed and closed
SETON STEPPING STONE SCHOOL is a Renovation/Alteration project located at 301 SETON PARKWAY Suite 103, Round Rock, TX 78665 in Round Rock, Texas. The project has an estimated value of $101K. LILLIBRIDGE is the property owner and AO3 INC is the design firm of record. The project was registered with TDLR on February 1, 2012.
โFrequently Asked Questions
What is SETON STEPPING STONE SCHOOL?
SETON STEPPING STONE SCHOOL is a renovation/alteration project at 301 SETON PARKWAY Suite 103 in Round Rock, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: 4.1.6 Renovation Alteration of existing space
Is SETON STEPPING STONE SCHOOL open in Round Rock?
Construction on SETON STEPPING STONE SCHOOL is complete โ TDLR records show the project passed its required accessibility inspection in May 2012. The building is finished and very likely open.
Where is SETON STEPPING STONE SCHOOL located?
SETON STEPPING STONE SCHOOL is located at 301 SETON PARKWAY Suite 103, Round Rock, TX, 78665, in Williamson County.
Who is the owner or developer of SETON STEPPING STONE SCHOOL?
LILLIBRIDGE is the property owner/developer of record for SETON STEPPING STONE SCHOOL, per its TDLR project registration.
Who is the architect or design firm for SETON STEPPING STONE SCHOOL?
AO3 INC is the design firm of record for SETON STEPPING STONE SCHOOL, according to its TDLR filing.
How much does SETON STEPPING STONE SCHOOL cost and how big is it?
SETON STEPPING STONE SCHOOL has an estimated construction value of $101K, based on its TDLR filing.
๐Scope of Work
4.1.6 Renovation Alteration of existing space
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Feb 1, 2012
Review Complete
Inspection Complete
Closed
May 1, 2012
๐Related Projects
๐คSame Owner
$7.9M total๐๏ธSame Design Firm
$32.1M total๐Nearby Projects
Within 1 km๐Related City Permits
Building permits found at or near this location
15 DAY - interior renovation of an existing Universal Technical Institute occupied space. New work to include new utilities required to support HVACR training equipment. No change of use or work to the exterior. - OVA
15 DAY - interior renovation of an existing Universal Technical Institute occupied space. New work to include new utilities required to support HVACR training equipment. No change of use or work to the exterior. - OVA
Replace kitchen outlets with GFCI bring garbage disposal hook up to code Install CIP concrete ramp and landing at front door to driveway.
7 DAY - fire damage. Replace roof replace siding replace 2 balconies replace trusses drywall lights in corridor painting exterior. - OVA
Primary bathroom guest bathroom and powder bathroom renovations including electrical fixtures and flooring throughout the unit. No structural or exterior work is proposed- Suite 5402