AXA FINANCIAL
AXA FINANCIAL is a renovation/alteration project at 9606 N. MOPAC Suite 950, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Sep 2016). The project has an estimated value of $95K.
๐Project Metrics
TDLR #EABPRJB6819687Project Closed
Project has been completed and closed
AXA FINANCIAL is a Renovation/Alteration project located at 9606 N. MOPAC Suite 950, Austin, TX 78759 in Austin, Texas. The project has an estimated value of $95K. STREAM REALTY is the property owner and AO3 INC is the design firm of record. The project was registered with TDLR on June 29, 2016.
โFrequently Asked Questions
What is AXA FINANCIAL?
AXA FINANCIAL is a renovation/alteration project at 9606 N. MOPAC Suite 950 in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Remodel existing office space on a multi tenant floor
Is AXA FINANCIAL open in Austin?
Construction on AXA FINANCIAL is complete โ TDLR records show the project passed its required accessibility inspection in Sep 2016. The building is finished and very likely open.
Where is AXA FINANCIAL located?
AXA FINANCIAL is located at 9606 N. MOPAC Suite 950, Austin, TX, 78759, in Travis County.
Who is the owner or developer of AXA FINANCIAL?
STREAM REALTY is the property owner/developer of record for AXA FINANCIAL, per its TDLR project registration.
Who is the architect or design firm for AXA FINANCIAL?
AO3 INC is the design firm of record for AXA FINANCIAL, according to its TDLR filing.
How much does AXA FINANCIAL cost and how big is it?
AXA FINANCIAL has an estimated construction value of $95K, based on its TDLR filing.
๐Scope of Work
Remodel existing office space on a multi tenant floor
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Jun 29, 2016
Review Complete
Inspection Complete
Closed
Sep 1, 2016
๐Related Projects
๐คSame Owner
$1.21B total๐๏ธSame Design Firm
$32.1M total๐Related City Permits
Building permits found at or near this location
Replacement of complete existing central heat and air system with or without duct work
replacing water heater and testing gas service due to fire in garage
INTERIOR ALTERATION OF APPROX.(832SF) OF EXISTING INTERIOR SPACE.
INTERIOR ALTERATION OF APPROX.(832SF) OF EXISTING INTERIOR SPACE.
INTERIOR ALTERATION OF APPROX.(832SF) OF EXISTING INTERIOR SPACE.