DR FYFE'S OFFICE
DR FYFE'S OFFICE is a renovation/alteration project at 720 WEST 34TH ST, SUITE 110, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jun 2012). The project has an estimated value of $217K.
๐Project Metrics
TDLR #EABPRJB2809363Project Closed
Project has been completed and closed
DR FYFE'S OFFICE is a Renovation/Alteration project located at 720 WEST 34TH ST, SUITE 110, Austin, TX 78705 in Austin, Texas. The project has an estimated value of $217K. LIVE OAK - GOTTESMAN is the property owner and STG DESIGN is the design firm of record. The project was registered with TDLR on May 17, 2012.
โFrequently Asked Questions
What is DR FYFE'S OFFICE?
DR FYFE'S OFFICE is a renovation/alteration project at 720 WEST 34TH ST, SUITE 110 in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Interior Office finish out
Is DR FYFE'S OFFICE open in Austin?
Construction on DR FYFE'S OFFICE is complete โ TDLR records show the project passed its required accessibility inspection in Jun 2012. The building is finished and very likely open.
Where is DR FYFE'S OFFICE located?
DR FYFE'S OFFICE is located at 720 WEST 34TH ST, SUITE 110, Austin, TX, 78705, in Travis County.
Who is the owner or developer of DR FYFE'S OFFICE?
LIVE OAK - GOTTESMAN is the property owner/developer of record for DR FYFE'S OFFICE, per its TDLR project registration.
Who is the architect or design firm for DR FYFE'S OFFICE?
STG DESIGN is the design firm of record for DR FYFE'S OFFICE, according to its TDLR filing.
How much does DR FYFE'S OFFICE cost and how big is it?
DR FYFE'S OFFICE has an estimated construction value of $217K, based on its TDLR filing.
๐Scope of Work
Interior Office finish out
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
May 17, 2012
Review Complete
Inspection Complete
Closed
Jun 1, 2012
๐Related Projects
๐คSame Owner
$18.0M total๐Nearby Projects
Within 1 km๐Related City Permits
Building permits found at or near this location
Replace old main disconnect panels with new main disconnect panels for Building #1 units #101 201 102 202. We are NOT changing existing services or amps. We will need power/meter disconnected in order to replace main disconnect panels.
Replace old main disconnect panels with new main disconnect panels for Building #2 units #103 203 104 204. We are NOT changing existing services or amps. We will need power/meter disconnected in order to replace main disconnect panels.
Replace old main disconnect panels with new main disconnect panels for Building #3 units #105 205 106 206 107 207 108 208. We are NOT changing existing services or amps. We will need power/meter disconnected in order to replace main disconnect panels.
Replace all cast iron pipes for PVC under Building 1 by making a tunnel.
Replace all cast iron pipes for PVC under Building 2 by making a tunnel.