Final inspection completed, awaiting project closure
NEIGHBORHOOD MIXED USE BUILDING is a New Construction project located at 712 W. 34TH ST., Austin, TX 78705 in Austin, Texas. The project has an estimated value of $750K. FRANK BARNES is the property owner and KRDB is the design firm of record. The project was registered with TDLR on September 14, 2016.
NEIGHBORHOOD MIXED USE BUILDING is a new construction project at 712 W. 34TH ST., Austin, TX 78705 in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: New construction of a three story mixed-use building w/office space on first & second story & residential unit
Construction on NEIGHBORHOOD MIXED USE BUILDING is complete โ TDLR records show the project passed its required accessibility inspection in Mar 2019. The building is finished and very likely open.
NEIGHBORHOOD MIXED USE BUILDING is located at 712 W. 34TH ST., Austin, TX 78705, Austin, TX, 78705, in Travis County.
FRANK BARNES is the property owner/developer of record for NEIGHBORHOOD MIXED USE BUILDING, per its TDLR project registration.
KRDB is the design firm of record for NEIGHBORHOOD MIXED USE BUILDING, according to its TDLR filing.
NEIGHBORHOOD MIXED USE BUILDING has an estimated construction value of $750K, based on its TDLR filing.
New construction of a three story mixed-use building w/office space on first & second story & residential unit
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Filed
Sep 14, 2016
Review Complete
Inspection Complete
Mar 1, 2019
Closed
Building permits found at or near this location
Replace old main disconnect panels with new main disconnect panels for Building #1 units #101 201 102 202. We are NOT changing existing services or amps. We will need power/meter disconnected in order to replace main disconnect panels.
Replace old main disconnect panels with new main disconnect panels for Building #2 units #103 203 104 204. We are NOT changing existing services or amps. We will need power/meter disconnected in order to replace main disconnect panels.
Replace old main disconnect panels with new main disconnect panels for Building #3 units #105 205 106 206 107 207 108 208. We are NOT changing existing services or amps. We will need power/meter disconnected in order to replace main disconnect panels.
Replace all cast iron pipes for PVC under Building 3 by making a tunnel.
Replace all cast iron pipes for PVC under Building 2 by making a tunnel.
City of Austin site plan approvals at this location
Need a contractor for this project?
Browse verified general contractors active in Travis County
Find General Contractors in Travis