OPTIMUS
OPTIMUS is a renovation/alteration project at 777 POST OAK, Houston, in Harris County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jun 2012). The project has an estimated value of $100K.
๐Project Metrics
TDLR #EABPRJB2809840Project Closed
Project has been completed and closed
OPTIMUS is a Renovation/Alteration project located at 777 POST OAK, Houston, TX 77056 in Houston, Texas. The project has an estimated value of $100K. GATEWAY RIDGECRES INC is the property owner and LEVINSON ALCOSER is the design firm of record. The project was registered with TDLR on March 20, 2012.
โFrequently Asked Questions
What is OPTIMUS?
OPTIMUS is a renovation/alteration project at 777 POST OAK in Houston, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: approx 3,000 sqft of tenant interior renocation work inan existing building.
Is OPTIMUS open in Houston?
Construction on OPTIMUS is complete โ TDLR records show the project passed its required accessibility inspection in Jun 2012. The building is finished and very likely open.
Where is OPTIMUS located?
OPTIMUS is located at 777 POST OAK, Houston, TX, 77056, in Harris County.
Who is the owner or developer of OPTIMUS?
GATEWAY RIDGECRES INC is the property owner/developer of record for OPTIMUS, per its TDLR project registration.
Who is the architect or design firm for OPTIMUS?
LEVINSON ALCOSER is the design firm of record for OPTIMUS, according to its TDLR filing.
How much does OPTIMUS cost and how big is it?
OPTIMUS has an estimated construction value of $100K, based on its TDLR filing.
๐Scope of Work
approx 3,000 sqft of tenant interior renocation work inan existing building.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Mar 20, 2012
Review Complete
Inspection Complete
Closed
Jun 1, 2012