PAPPAS BBQ
PAPPAS BBQ is a new construction project at HIGHWAY 69 @ SOUTH NAIN ST, Duncanville, in Dallas County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Dec 2019). The project has an estimated value of $2.5M across about 7,000 sq ft.
๐Project Metrics
TDLR #EABPRJB8820800Project Closed
Project has been completed and closed
PAPPAS BBQ is a New Construction project located at HIGHWAY 69 @ SOUTH NAIN ST, Duncanville, TX 75137 in Duncanville, Texas. The project has an estimated value of $2.5M covering 7,000 sq ft. PAPPAS RESTURANTS is the property owner and LEVINSON ALCOSER is the design firm of record. The project was registered with TDLR on July 3, 2018.
โFrequently Asked Questions
What is PAPPAS BBQ?
PAPPAS BBQ is a new construction project at HIGHWAY 69 @ SOUTH NAIN ST in Duncanville, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Approx 7,00 Sq Ft of new resturant
Is PAPPAS BBQ open in Duncanville?
Construction on PAPPAS BBQ is complete โ TDLR records show the project passed its required accessibility inspection in Dec 2019. The building is finished and very likely open.
Where is PAPPAS BBQ located?
PAPPAS BBQ is located at HIGHWAY 69 @ SOUTH NAIN ST, Duncanville, TX, 75137, in Dallas County.
Who is the owner or developer of PAPPAS BBQ?
PAPPAS RESTURANTS is the property owner/developer of record for PAPPAS BBQ, per its TDLR project registration.
Who is the architect or design firm for PAPPAS BBQ?
LEVINSON ALCOSER is the design firm of record for PAPPAS BBQ, according to its TDLR filing.
How much does PAPPAS BBQ cost and how big is it?
PAPPAS BBQ has an estimated construction value of $2.5M and approximately 7,000 square feet (about $357/sqft), based on its TDLR filing.
๐Scope of Work
Approx 7,00 Sq Ft of new resturant
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Jul 3, 2018
Review Complete
Inspection Complete
Closed
Dec 12, 2019
๐Related Projects
๐คSame Owner
$7.3M total๐๏ธSame Design Firm
$4.0M totalProperty Owner
Design Firm
Registered Accessibility Specialist
Dallas County Economy
Explore Area
Find Professionals