EDISON PLAZA PHASE 1
EDISON PLAZA PHASE 1 is a renovation/alteration project at 350 PINE ST. Suite 205, Beaumont, in Jefferson County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Nov 2012). The project has an estimated value of $500K.
๐Project Metrics
TDLR #EABPRJB2813183Project Closed
Project has been completed and closed
EDISON PLAZA PHASE 1 is a Renovation/Alteration project located at 350 PINE ST. Suite 205, Beaumont, TX 77701 in Beaumont, Texas. The project has an estimated value of $500K. MIKE ALBANESE is the property owner and N-VIZION DESIGN is the design firm of record. The project was registered with TDLR on May 17, 2012.
โFrequently Asked Questions
What is EDISON PLAZA PHASE 1?
EDISON PLAZA PHASE 1 is a renovation/alteration project at 350 PINE ST. Suite 205 in Beaumont, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: EXTERIOR RENOVATION AT ENTRY TO EXISTING 17 STORY BUILDING INCLUDING SIGNAGE, EXTERIOR WALKWAYS, AND EXTERIOR LA
Is EDISON PLAZA PHASE 1 open in Beaumont?
Construction on EDISON PLAZA PHASE 1 is complete โ TDLR records show the project passed its required accessibility inspection in Nov 2012. The building is finished and very likely open.
Where is EDISON PLAZA PHASE 1 located?
EDISON PLAZA PHASE 1 is located at 350 PINE ST. Suite 205, Beaumont, TX, 77701, in Jefferson County.
Who is the owner or developer of EDISON PLAZA PHASE 1?
MIKE ALBANESE is the property owner/developer of record for EDISON PLAZA PHASE 1, per its TDLR project registration.
Who is the architect or design firm for EDISON PLAZA PHASE 1?
N-VIZION DESIGN is the design firm of record for EDISON PLAZA PHASE 1, according to its TDLR filing.
How much does EDISON PLAZA PHASE 1 cost and how big is it?
EDISON PLAZA PHASE 1 has an estimated construction value of $500K, based on its TDLR filing.
๐Scope of Work
EXTERIOR RENOVATION AT ENTRY TO EXISTING 17 STORY BUILDING INCLUDING SIGNAGE, EXTERIOR WALKWAYS, AND EXTERIOR LA
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
May 17, 2012
Review Complete
Inspection Complete
Closed
Nov 1, 2012