Construction complete ยท Nov 2012๐ŸProject Closed๐Ÿ”ง Renovation/Alteration๐Ÿ’ต This project is privately funded, on private land for private use.

GREAT HILLS PLAZA 3RD FLOOR WEST

9600 GREAT HILLS TRAIL, Austin, TX 78759, Austin, TX, 78759

GREAT HILLS PLAZA 3RD FLOOR WEST is a renovation/alteration project at 9600 GREAT HILLS TRAIL, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Nov 2012). The project has an estimated value of $90K.

Completed100%

๐Ÿ“ŠProject Metrics

TDLR #EABPRJB3800030
$90K
Project Value
โ€”
Square Feet
โ€”
Cost/SqFt
2 months
Duration
Registered:Sep 4, 2012
Start:Sep 1, 2012
Target:Nov 1, 2012
๐Ÿ

Project Closed

Project has been completed and closed

GREAT HILLS PLAZA 3RD FLOOR WEST is a Renovation/Alteration project located at 9600 GREAT HILLS TRAIL, Austin, TX 78759 in Austin, Texas. The project has an estimated value of $90K. THOMAS PROPERTIES GROUP is the property owner. The project was registered with TDLR on September 4, 2012.

โ“Frequently Asked Questions

What is GREAT HILLS PLAZA 3RD FLOOR WEST?

GREAT HILLS PLAZA 3RD FLOOR WEST is a renovation/alteration project at 9600 GREAT HILLS TRAIL in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Minor interior finish renovation of existing building corridor and restrooms.

Is GREAT HILLS PLAZA 3RD FLOOR WEST open in Austin?

Construction on GREAT HILLS PLAZA 3RD FLOOR WEST is complete โ€” TDLR records show the project passed its required accessibility inspection in Nov 2012. The building is finished and very likely open.

Where is GREAT HILLS PLAZA 3RD FLOOR WEST located?

GREAT HILLS PLAZA 3RD FLOOR WEST is located at 9600 GREAT HILLS TRAIL, Austin, TX, 78759, in Travis County.

Who is the owner or developer of GREAT HILLS PLAZA 3RD FLOOR WEST?

THOMAS PROPERTIES GROUP is the property owner/developer of record for GREAT HILLS PLAZA 3RD FLOOR WEST, per its TDLR project registration.

How much does GREAT HILLS PLAZA 3RD FLOOR WEST cost and how big is it?

GREAT HILLS PLAZA 3RD FLOOR WEST has an estimated construction value of $90K, based on its TDLR filing.

๐Ÿ“‹Scope of Work

Minor interior finish renovation of existing building corridor and restrooms.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

๐Ÿ“…Compliance Timeline

Project Registered
September 4, 2012
Project Closed
November 1, 2012
Construction Start
September 1, 2012
Expected Completion
November 1, 2012

๐Ÿ“…Project Timeline

Filed

Sep 4, 2012

Review Complete

Inspection Complete

Closed

Nov 1, 2012

๐Ÿ“Location & Views

Open in MapsGet Directions|30.39493, -97.75472

๐Ÿ“„Related City Permits

Building permits found at or near this location

9600 N MOPAC EXPY SVRD SB UNIT 900
1.27 mi away

ePlan: Commercial Expedited Review - Interior Remodel to Existing Office Space (22320 SF)

ActiveElectrical PermitRemodelJun 2026
View Details
2026-079907 EP
๐Ÿ”งCharlie Morris Electrical Dial One Inc
9600 N MOPAC EXPY SVRD SB
1.27 mi away

Compass 92J14057 Wall Sign (front lit channel letter on support frame)

ActiveElectrical PermitWallJun 2026
View Details
2026-080259 EP
9600 N MOPAC EXPY SVRD SB UNIT 900
1.27 mi away

ePlan: Commercial Expedited Review - Interior Remodel to Existing Office Space (22320 SF)

ActiveMechanical PermitRemodelJun 2026
View Details
2026-079907 MP
๐Ÿ”งG & S Mechanical LLC
9600 N LAMAR BLVD
4.05 mi away

Replacement of existing exterior grease interceptor with a new 1000-gallon City of Austin approved unit in the same location. Like-for-like replacement no re-routing or extension of pipelines and no change to fixture count. Performed under Austin Water Industrial Waste Approval No. 2026-079402-00. Existing interceptor failed Austin Water inspection on 8/11/2025; replacement required by 8/11/2026.

ActivePlumbing PermitGrease Interceptor (GI) replacementJun 2026
View Details
2026-079519 PP
๐Ÿ”งComplete Plumbing & HVAC dba Get Complete Maintenance & Repair
9600 AIRE LIBRE DR
5.29 mi away

Disconnect/reconnect to tie in pv/ESS components. We are not upgrading the size of the service not upgrading the meter size. 5.22kW system

ActiveElectrical PermitRepairJul 2026
View Details
2026-087654 EP
๐Ÿ”งFreedom Solar Power

Get alerts for Travis

Daily email when new projects start nearby.

Start Alerts - $19/mo

Download project data

Get curated lists of projects with full contact info.

Browse Data Lists