ENSCO RESTACK PHASE 3-FLRS 37&38
ENSCO RESTACK PHASE 3-FLRS 37&38 is a renovation/alteration project at 5847 SAN FELIPE, Houston, in Harris County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Sep 2014). The project has an estimated value of $2.0M.
๐Project Metrics
TDLR #EABPRJB4807418Project Closed
Project has been completed and closed
ENSCO RESTACK PHASE 3-FLRS 37&38 is a Renovation/Alteration project located at 5847 SAN FELIPE, Houston, TX 77057 in Houston, Texas. The project has an estimated value of $2.0M. THOMAS PROPERTIES GROUP is the property owner and KEN R. HARRY ASSOCIATES INC. is the design firm of record. The project was registered with TDLR on January 14, 2014.
โFrequently Asked Questions
What is ENSCO RESTACK PHASE 3-FLRS 37&38?
ENSCO RESTACK PHASE 3-FLRS 37&38 is a renovation/alteration project at 5847 SAN FELIPE in Houston, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Tenant interior build-out of two consecutive floors.
Is ENSCO RESTACK PHASE 3-FLRS 37&38 open in Houston?
Construction on ENSCO RESTACK PHASE 3-FLRS 37&38 is complete โ TDLR records show the project passed its required accessibility inspection in Sep 2014. The building is finished and very likely open.
Where is ENSCO RESTACK PHASE 3-FLRS 37&38 located?
ENSCO RESTACK PHASE 3-FLRS 37&38 is located at 5847 SAN FELIPE, Houston, TX, 77057, in Harris County.
Who is the owner or developer of ENSCO RESTACK PHASE 3-FLRS 37&38?
THOMAS PROPERTIES GROUP is the property owner/developer of record for ENSCO RESTACK PHASE 3-FLRS 37&38, per its TDLR project registration.
Who is the architect or design firm for ENSCO RESTACK PHASE 3-FLRS 37&38?
KEN R. HARRY ASSOCIATES INC. is the design firm of record for ENSCO RESTACK PHASE 3-FLRS 37&38, according to its TDLR filing.
How much does ENSCO RESTACK PHASE 3-FLRS 37&38 cost and how big is it?
ENSCO RESTACK PHASE 3-FLRS 37&38 has an estimated construction value of $2.0M, based on its TDLR filing.
๐Scope of Work
Tenant interior build-out of two consecutive floors.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Jan 14, 2014
Review Complete
Inspection Complete
Closed
Sep 1, 2014