SPEC SUITE 605
SPEC SUITE 605 is a renovation/alteration project at 14180 DALLAS PARKWAY Suite 605, Dallas, in Dallas County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Mar 2013). The project has an estimated value of $80K.
๐Project Metrics
TDLR #EABPRJB3805038Project Closed
Project has been completed and closed
SPEC SUITE 605 is a Renovation/Alteration project located at 14180 DALLAS PARKWAY Suite 605, Dallas, TX 75254 in Dallas, Texas. The project has an estimated value of $80K. KBS is the property owner and ENTOS DESIGN is the design firm of record. The project was registered with TDLR on December 6, 2012.
โFrequently Asked Questions
What is SPEC SUITE 605?
SPEC SUITE 605 is a renovation/alteration project at 14180 DALLAS PARKWAY Suite 605 in Dallas, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Interior renovation
Is SPEC SUITE 605 open in Dallas?
Construction on SPEC SUITE 605 is complete โ TDLR records show the project passed its required accessibility inspection in Mar 2013. The building is finished and very likely open.
Where is SPEC SUITE 605 located?
SPEC SUITE 605 is located at 14180 DALLAS PARKWAY Suite 605, Dallas, TX, 75254, in Dallas County.
Who is the owner or developer of SPEC SUITE 605?
KBS is the property owner/developer of record for SPEC SUITE 605, per its TDLR project registration.
Who is the architect or design firm for SPEC SUITE 605?
ENTOS DESIGN is the design firm of record for SPEC SUITE 605, according to its TDLR filing.
How much does SPEC SUITE 605 cost and how big is it?
SPEC SUITE 605 has an estimated construction value of $80K, based on its TDLR filing.
๐Scope of Work
Interior renovation
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Dec 6, 2012
Review Complete
Inspection Complete
Closed
Mar 1, 2013