Project has been completed and closed
GRIFOLS 2ND FLOOR LAB is a Renovation/Alteration project located at 201 CARLSON CIRCLE, San Marcos, TX 78666 in San Marcos, Texas. The project has an estimated value of $369K. GRIFOLS INC is the property owner and HABITEC is the design firm of record. The project was registered with TDLR on February 28, 2013.
GRIFOLS 2ND FLOOR LAB is a renovation/alteration project at 201 CARLSON CIRCLE, San Marcos, TX 78666 in San Marcos, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Complete one room build out for lab space in existing empty shell space.
Construction on GRIFOLS 2ND FLOOR LAB is complete โ TDLR records show the project passed its required accessibility inspection in Jun 2013. The building is finished and very likely open.
GRIFOLS 2ND FLOOR LAB is located at 201 CARLSON CIRCLE, San Marcos, TX 78666, San Marcos, TX, 78666, in Hays County.
GRIFOLS INC is the property owner/developer of record for GRIFOLS 2ND FLOOR LAB, per its TDLR project registration.
HABITEC is the design firm of record for GRIFOLS 2ND FLOOR LAB, according to its TDLR filing.
GRIFOLS 2ND FLOOR LAB has an estimated construction value of $369K, based on its TDLR filing.
Complete one room build out for lab space in existing empty shell space.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Filed
Feb 28, 2013
Review Complete
Inspection Complete
Closed
Jun 1, 2013
Building permits found at or near this location
Partially enclosing the front porch area to add to the living room remodeling throughout of floors bathrooms closets and kitchen reinsulating the exterior walls and siding replacement. No change to impervious cover
Tunnel under the foundation to repair a break in the PVC drain line in the master bathroom and hall bathroom with SCH 40 PVC. There will be two access holds in front of and behind the house.
up to a 50 pipe burst to replace the sewer line in yard as well as tunnel up to 50 under the home to replace the cast iron line.
Replacement of complete existing central heat and air system with or without duct work Install replacement of 2.5 Ton AC System
Remove existing pool and replace with a new pool with the same specifications.