SPEC SUITE 450
SPEC SUITE 450 is a renovation/alteration project at 909 LAKE CAROLYN PARKWAY, Irving, in Dallas County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed May 2013). The project has an estimated value of $82K.
๐Project Metrics
TDLR #EABPRJB3809841Project Closed
Project has been completed and closed
SPEC SUITE 450 is a Renovation/Alteration project located at 909 LAKE CAROLYN PARKWAY, Irving, TX 75039 in Irving, Texas. The project has an estimated value of $82K. KBS is the property owner and ENTOS DESIGN is the design firm of record. The project was registered with TDLR on March 11, 2013.
โFrequently Asked Questions
What is SPEC SUITE 450?
SPEC SUITE 450 is a renovation/alteration project at 909 LAKE CAROLYN PARKWAY in Irving, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Renovation of suite 450
Is SPEC SUITE 450 open in Irving?
Construction on SPEC SUITE 450 is complete โ TDLR records show the project passed its required accessibility inspection in May 2013. The building is finished and very likely open.
Where is SPEC SUITE 450 located?
SPEC SUITE 450 is located at 909 LAKE CAROLYN PARKWAY, Irving, TX, 75039, in Dallas County.
Who is the owner or developer of SPEC SUITE 450?
KBS is the property owner/developer of record for SPEC SUITE 450, per its TDLR project registration.
Who is the architect or design firm for SPEC SUITE 450?
ENTOS DESIGN is the design firm of record for SPEC SUITE 450, according to its TDLR filing.
How much does SPEC SUITE 450 cost and how big is it?
SPEC SUITE 450 has an estimated construction value of $82K, based on its TDLR filing.
๐Scope of Work
Renovation of suite 450
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Mar 11, 2013
Review Complete
Inspection Complete
Closed
May 1, 2013