SNAP KITCHEN #9
SNAP KITCHEN #9 is a renovation/alteration project at 6700 S RICE BLVD, Bellaire, in Harris County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Aug 2013). The project has an estimated value of $150K.
๐Project Metrics
TDLR #EABPRJB3814430Project Closed
Project has been completed and closed
SNAP KITCHEN #9 is a Renovation/Alteration project located at 6700 S RICE BLVD, Bellaire, TX 77401 in Bellaire, Texas. The project has an estimated value of $150K. PIPELINE REALTY is the property owner and MICHAEL HSU OF ARCHITECTURE is the design firm of record. The project was registered with TDLR on May 28, 2013.
โFrequently Asked Questions
What is SNAP KITCHEN #9?
SNAP KITCHEN #9 is a renovation/alteration project at 6700 S RICE BLVD in Bellaire, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: +/- 782 sf tenant finish-out into a retail take-away food store.
Is SNAP KITCHEN #9 open in Bellaire?
Construction on SNAP KITCHEN #9 is complete โ TDLR records show the project passed its required accessibility inspection in Aug 2013. The building is finished and very likely open.
Where is SNAP KITCHEN #9 located?
SNAP KITCHEN #9 is located at 6700 S RICE BLVD, Bellaire, TX, 77401, in Harris County.
Who is the owner or developer of SNAP KITCHEN #9?
PIPELINE REALTY is the property owner/developer of record for SNAP KITCHEN #9, per its TDLR project registration.
Who is the architect or design firm for SNAP KITCHEN #9?
MICHAEL HSU OF ARCHITECTURE is the design firm of record for SNAP KITCHEN #9, according to its TDLR filing.
How much does SNAP KITCHEN #9 cost and how big is it?
SNAP KITCHEN #9 has an estimated construction value of $150K, based on its TDLR filing.
๐Scope of Work
+/- 782 sf tenant finish-out into a retail take-away food store.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
May 28, 2013
Review Complete
Inspection Complete
Closed
Aug 1, 2013