FUZZY'S TACO SHOP
FUZZY'S TACO SHOP is a renovation/alteration project at 3351 TURNER PLAZA DRIVE Suite 100-N, Abilene, in Taylor County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Aug 2013). The project has an estimated value of $200K.
๐Project Metrics
TDLR #EABPRJB3814459Project Closed
Project has been completed and closed
FUZZY'S TACO SHOP is a Renovation/Alteration project located at 3351 TURNER PLAZA DRIVE Suite 100-N, Abilene, TX 76909 in Abilene, Texas. The project has an estimated value of $200K. TURNER PLAZA DRIVE LTD is the property owner and 708 STUDIOS LLC is the design firm of record. The project was registered with TDLR on May 29, 2013.
โFrequently Asked Questions
What is FUZZY'S TACO SHOP?
FUZZY'S TACO SHOP is a renovation/alteration project at 3351 TURNER PLAZA DRIVE Suite 100-N in Abilene, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Remodel existing restaurant
Is FUZZY'S TACO SHOP open in Abilene?
Construction on FUZZY'S TACO SHOP is complete โ TDLR records show the project passed its required accessibility inspection in Aug 2013. The building is finished and very likely open.
Where is FUZZY'S TACO SHOP located?
FUZZY'S TACO SHOP is located at 3351 TURNER PLAZA DRIVE Suite 100-N, Abilene, TX, 76909, in Taylor County.
Who is the owner or developer of FUZZY'S TACO SHOP?
TURNER PLAZA DRIVE LTD is the property owner/developer of record for FUZZY'S TACO SHOP, per its TDLR project registration.
Who is the architect or design firm for FUZZY'S TACO SHOP?
708 STUDIOS LLC is the design firm of record for FUZZY'S TACO SHOP, according to its TDLR filing.
How much does FUZZY'S TACO SHOP cost and how big is it?
FUZZY'S TACO SHOP has an estimated construction value of $200K, based on its TDLR filing.
๐Scope of Work
Remodel existing restaurant
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
May 29, 2013
Review Complete
Inspection Complete
Closed
Aug 1, 2013