FIIZ DRINKS
FIIZ DRINKS is a renovation/alteration project at 6495 DALLAS PKWY. STE. A, Frisco, in Collin County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Aug 2018). The project has an estimated value of $80K.
๐Project Metrics
TDLR #EABPRJB8819299Inspection Complete
Final inspection completed, awaiting project closure
FIIZ DRINKS is a Renovation/Alteration project located at 6495 DALLAS PKWY. STE. A, Frisco, TX 75034 in Frisco, Texas. The project has an estimated value of $80K. QUANIA PETROLEUM is the property owner and 708 STUDIOS LLC is the design firm of record. The project was registered with TDLR on June 12, 2018.
โFrequently Asked Questions
What is FIIZ DRINKS?
FIIZ DRINKS is a renovation/alteration project at 6495 DALLAS PKWY. STE. A in Frisco, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Remodel existing suite to become restaurant.
Is FIIZ DRINKS open in Frisco?
Construction on FIIZ DRINKS is complete โ TDLR records show the project passed its required accessibility inspection in Aug 2018. The building is finished and very likely open.
Where is FIIZ DRINKS located?
FIIZ DRINKS is located at 6495 DALLAS PKWY. STE. A, Frisco, TX, 75034, in Collin County.
Who is the owner or developer of FIIZ DRINKS?
QUANIA PETROLEUM is the property owner/developer of record for FIIZ DRINKS, per its TDLR project registration.
Who is the architect or design firm for FIIZ DRINKS?
708 STUDIOS LLC is the design firm of record for FIIZ DRINKS, according to its TDLR filing.
How much does FIIZ DRINKS cost and how big is it?
FIIZ DRINKS has an estimated construction value of $80K, based on its TDLR filing.
๐Scope of Work
Remodel existing suite to become restaurant.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Jun 12, 2018
Review Complete
Inspection Complete
Aug 1, 2018
Closed