MET CENTER II-BLDG 2
MET CENTER II-BLDG 2 is a new construction project at 7900 METROPOLITAN DR., Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Oct 2014). The project has an estimated value of $8.0M.
๐Project Metrics
TDLR #EABPRJB4800455Project Closed
Project has been completed and closed
MET CENTER II-BLDG 2 is a New Construction project located at 7900 METROPOLITAN DR., Austin, TX 78744 in Austin, Texas. The project has an estimated value of $8.0M. ZYDECO DEVELOPMENT is the property owner and STUDIO 8 ARCHITECTS is the design firm of record. The project was registered with TDLR on September 10, 2013.
โFrequently Asked Questions
What is MET CENTER II-BLDG 2?
MET CENTER II-BLDG 2 is a new construction project at 7900 METROPOLITAN DR. in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: New shell building construction with no interior finishout
Is MET CENTER II-BLDG 2 open in Austin?
Construction on MET CENTER II-BLDG 2 is complete โ TDLR records show the project passed its required accessibility inspection in Oct 2014. The building is finished and very likely open.
Where is MET CENTER II-BLDG 2 located?
MET CENTER II-BLDG 2 is located at 7900 METROPOLITAN DR., Austin, TX, 78744, in Travis County.
Who is the owner or developer of MET CENTER II-BLDG 2?
ZYDECO DEVELOPMENT is the property owner/developer of record for MET CENTER II-BLDG 2, per its TDLR project registration.
Who is the architect or design firm for MET CENTER II-BLDG 2?
STUDIO 8 ARCHITECTS is the design firm of record for MET CENTER II-BLDG 2, according to its TDLR filing.
How much does MET CENTER II-BLDG 2 cost and how big is it?
MET CENTER II-BLDG 2 has an estimated construction value of $8.0M, based on its TDLR filing.
๐Scope of Work
New shell building construction with no interior finishout
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Sep 10, 2013
Review Complete
Inspection Complete
Closed
Oct 1, 2014
๐Related Projects
๐คSame Owner
$306.3M total๐Related City Permits
Building permits found at or near this location
New In-ground 300 SF Concrete Pool and associated equipment and pad.
New In-ground 300 SF Concrete Pool and associated equipment and pad.
Upgrade existing 100-amp service to 200-amp including new wire in existing meter new 200-amp main breaker in existing disconnect and new exterior panel.
Provide and install automatic transfer switch and electric panel for connecting air cooled chiller #3 to generator backup power at Ascension Seton Southwest Hospital.
New In-ground 300 SF Concrete Pool and associated equipment and pad.
Property Owner
Design Firm
Travis County Economy
Explore Area
Find Professionals
Need a contractor for this project?
Browse verified general contractors active in Travis County
Find General Contractors in Travis