Zabalist
ZabalistTexas Construction
๐Ÿ  Home
๐Ÿ“‹ Directory
๐Ÿ’Ž Pricing๐Ÿ“Š Data
Sign InCreate Account
Zabalist
ZabalistTexas Construction

The most comprehensive Texas construction intelligence platform. Search verified contractors, track permits, and explore projects across the state.

โœ“ Verified DataFree to Search

Directory

  • Contractors
  • Builders
  • Architects
  • Developers
  • Property Owners

Construction Data

  • Building Permits
  • State Projects
  • Site Plans
  • Texas RFPs & Bids
  • Browse by City
  • Browse by County

Free Tools

  • Contractor License Lookup
  • Permit Cost Estimator
  • Free Contractor Badges
  • About Zabalist
  • Contact Us

ยฉ 2026 Smart Austin LLC d/b/a Moon Sherpa Labs. All rights reserved.

TermsPrivacyCookiesDo Not SellAccessibilityDMCAData Sources
Data from verified public sources. Not affiliated with any government agency.
  1. Home
  2. /
  3. Projects
  4. /
  5. Travis
Construction complete ยท May 2019๐ŸProject Closed๐Ÿ—๏ธ New Construction๐Ÿ’ต This project is privately funded, on private land for private use.

MET CENTER BUILDING 10

6800 METROPOLIS DRIVE, Austin, TX 78744, Austin, TX, 78744
Completed100%

๐Ÿ“ŠProject Metrics

TDLR #EABPRJB8817826
$6.5M
Project Value
โ€”
Square Feet
โ€”
Cost/SqFt
10 months
Duration
Registered:May 23, 2018
Start:Jul 1, 2018
Target:May 1, 2019
๐Ÿ

Project Closed

Project has been completed and closed

MET CENTER BUILDING 10 is a New Construction project located at 6800 METROPOLIS DRIVE, Austin, TX 78744 in Austin, Texas. The project has an estimated value of $6.5M. ZYDECO DEVELOPMENT is the property owner and STUDIO 8 ARCHITECTS is the design firm of record. The project was registered with TDLR on May 23, 2018.

๐Ÿ“‹Scope of Work

1 story, 129,600 sf tiltwall office shell building.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

๐Ÿ“…Compliance Timeline

Project Registered
May 23, 2018
Project Closed
May 1, 2019
Construction Start
July 1, 2018
Expected Completion
May 1, 2019

๐Ÿ“…Project Timeline

Filed

May 23, 2018

Review Complete

Inspection Complete

Closed

May 1, 2019

๐Ÿ”—Related Projects

๐Ÿ‘คSame Owner

$306.3M total
CITY OF AUSTIN MUNICIPAL COURTHOUSE
Austinยท$9.4M
MET CENTER OFFICE BUILDING B
Austinยท$3.0M
PHRG
Austinยท$1.6M

๐Ÿ›๏ธSame Design Firm

$1.22B total
WESTINGHOUSE BUSINESS CENTER PHASE 1
Georgetownยท$8.0M
2600 S 1ST
Austinยท$2.8M
WONDER WORLD MEDICAL SQUARE
San Marcosยท$3.0M
CITY OF AUSTIN MUNICIPAL COURTHOUSE
Austinยท$9.4M

๐Ÿ“„Related City Permits

Building permits found at or near this location

6800 ROCKLEDGE CV

Addition and remodel. Total reconfiguring of interior/full interior remodel expand area of new kitchen at rear of structure enclose area under front covered porch to create new entry and breakfast areas increase garage by 3 at opening

ActiveBuilding PermitAddition and RemodelJun 2026
$1
View Details
2026-071791 BP
๐Ÿ”งWilmington-Gordon Inc.****MAIN****
6800 EDINBURGH CV

Install a T-pole for home repairs Ref: 2026- 060030 BP

FinalElectrical PermitHomebuilder LoopMay 2026
View Details
2026-066612 EP
๐Ÿ”งBeltran Electric
6800 VIA CORRETO DR

Replacement of complete existing central heat and air system with or without duct work LIKE FOR LIKE: 4 Ton Gas Horizontal System (Main) LIKE FOR LIKE: 2 Ton 2 Stage Gas Horizontal (Master/Bedrooms) **TWO SYSTEM CHANGE OUT**

ActiveMechanical PermitChange OutMay 2026
View Details
2026-062803 MP
๐Ÿ”งStan's Heating, Air, Plumbing, & Electrical
6800 EDINBURGH CV

Express- House burned down minor express permit being requested. Received a letter from the code enforcement stating need to acquire necessary permits/inspections before it is considered habitable.

ActiveBuilding PermitRepairMay 2026
$1
View Details
2026-060030 BP
๐Ÿ”งRamsey Contracting
6800 GLEN RIDGE DR

Tunnel under foundation to replace cast iron for 3 full bathrooms kitchen and washer drain lines total length of tunnel is approximately 70 feet long. Two access holes will be made one in the front by the primary bathroom and the second on the right side of the home by the garage. Sewer line will also be replaced with a total length of 50 feet to reach the city tap connection.

FinalPlumbing PermitRepairApr 2026
View Details
2026-037648 PP
๐Ÿ”งCalixto Plumbing

Quick Actions

View on TDLR
TDLR ID: EABPRJB8817826

Property Owner

๐Ÿ‘ค
ZYDECO DEVELOPMENT
Contact: Registered by TDLR
27 projects ยท $306.3M
View company profile
REBECCA NIXON 911 RIO GRANDE, AUSTIN, TX 78701
(512) 479-7850

Design Firm

๐Ÿ›๏ธ
STUDIO 8 ARCHITECTS
300 projects ยท $1.22B
View company profile
MILTON HIME 611 W. 15TH STREET, AUSTIN, TX 78701
(512) 473-8989

Registered Accessibility Specialist

๐Ÿ“‹
CLARENCE A,HAYNIE
RAS #54
PO BOX 9063, AUSTIN, TX 78766
(512) 459-2121

Explore Area

๐Ÿ™๏ธ
Austin
View city projects
๐Ÿ—บ๏ธ
Travis County
View county projects
๐Ÿ“ฎ
ZIP 78744
View zip code projects

Find Professionals

๐Ÿ”จ
Contractors in Austin
Licensed contractors directory
๐Ÿ—๏ธ
Builders in Austin
Home & commercial builders
๐Ÿ“
Architects in Austin
Architecture & design firms

Need a contractor for this project?

Browse verified general contractors active in Travis County

Find General Contractors in Travis

Get alerts for Travis

Daily email when new projects start nearby.

Start Alerts - $19/mo

Download project data

Get curated lists of projects with full contact info.

Browse Data Lists
Explore All Projects